What Five Stage Inspection Actually Checks
A stage-by-stage account of the five inspection points on a Termiki order, from incoming raw material to the pre-shipment sample drawn by QC staff.
Why the number matters less than the placement
Any factory can say it inspects. What decides whether inspection is useful is where in the process it happens, because a fault caught at the moulding machine costs a shift and a fault caught at the port costs a shipment. Five stages are written into every Termiki order for that reason.
Stage one: incoming raw material
Resin and fabric are checked on arrival against what the signed golden sample was built from. A material substitution that gets past this point will not be visible again until a customer complains about feel or colour.
Stage two: injection moulding
First-off parts are checked at the machine. Because moulding happens in our own workshop rather than at a subcontractor, a correction happens on the same shift instead of in the next available slot on someone else's schedule.
Stage three: assembly
Seals, scoops, valves and fittings are checked as they go together. This is the last stage at which a sealing fault is cheap, which is why leak-related complaints trace back to factories that skip it.
Stage four: packing
Carton contents, colour box, labelling and barcodes are checked against your packing list. Most customs and DC queries come from a mismatch introduced here, not from the product.
Stage five: pre-shipment sampling
A sample is drawn and inspected by professional QC staff rather than by the operators who built the goods. The separation is the point: the people checking are not the people being checked.
What you should ask any supplier
Not how many inspections, but who performs the last one and against what reference. If the answer is the production line and no signed sample, the inspection is a formality.
Products This Guide Applies To

400g Leak-Proof Portable Formula Dispenser Container
Model FD-23Y002

Baby Nasal Aspirator Nose Cleaner
Model KNC-22Y004

28″x 52″ Breathable Fitted Soft Cozy Trendy Muslin Cotton Crib Sheet
Model BDS-23Y002

4pcs Wearable Protect Sore Nipple Breast Shell Set
Model MTN-22Y003
Other Guides for Buyers
How to Specify a Private Label Baby Bottle
Read →ComparisonChoosing Between Manual and Electric Breast Pumps
Read →Material GuideMuslin Cotton Versus Jersey for Baby Bedding
Read →Buying GuideMOQ Lead Time and Payment Terms Explained
Read →Design GuideDesigning Out Leaks in Baby Feeding Products
Read →Product GuideBuilding a Baby Safety Range for Retail
Read →Buying GuidePackaging Choices Colour Box Versus OPP Bag
Read →Questions on This Topic
Can we join the pre-shipment inspection?
Yes. Customer and third-party inspections are welcome. Tell us at PO stage so the booking lines up with the packing date.
What is inspection carried out against?
The signed golden sample agreed before production, which is why both sides sign it.
Are you ISO certified?
Production and management are run to ISO procedure. Ask us for the current certificate status before relying on it in a tender. TBC.
Do you issue an inspection report?
Ask for it on the PO and it will be prepared with the shipment documents.
Ask a Specification Question
Send the SKU or the spec you are trying to settle and we will answer it directly.