
All in One 125kw 261kwh IP54 Liquid Cooling ESS Cabinet
125 kW / 261 kWh
All in One 125kw 261kwh IP54 Liquid Cooling ESS Cabinet is an outdoor all-in-one energy storage cabinet rated at 125 kW / 261 kWh. It arrives wired and tested, which removes the rack-by-rack integration work that normally sits on the EPC's critical path.
What This Product Changes On Your Project
- Battery, thermal management, BMS and fire suppression are specified against each other by one supplier
- Modular capacity - additional units run in parallel as the site load or tariff exposure grows
- Sized for peak shaving and demand-charge reduction, where the payback is a billing line item rather than a generation estimate
- Remote monitoring over standard industrial protocols, so the system reports into an existing SCADA or EMS
- Outdoor-rated enclosure removes the cost of a dedicated, ventilated battery room
Application Scenarios
- Grid-side projects providing frequency and capacity support
- Sites whose grid connection cannot be upgraded, using storage instead of more feeder capacity
- Mining, quarry and remote industrial sites running a diesel-PV-storage hybrid
- EV charging hubs buffering the grid draw of simultaneous fast-charge sessions
- Manufacturing plants shaving monthly demand peaks set by start-up loads
Who It Is For
- Distributors supplying C&I storage into their own installer network
- EPC contractors delivering commercial and industrial storage projects
- Industrial plant engineers managing demand charges and process continuity
- Independent power producers and grid-side project developers
Problems It Solves
- Battery-room construction, ventilation and fire compliance that can cost more than the batteries
- Multi-vendor integration risk when cells, PCS and controls come from three suppliers with three warranties
- Demand charges set by a handful of peak intervals each month rather than by total consumption
- Grid connection capacity that will not be upgraded in time for the site's growth plan
Technical Features
- Parallel operation of multiple units under one energy management layer
- Industrial communication interfaces for SCADA, EMS and remote diagnostics
- Cells, racks, BMS, thermal management and fire suppression integrated and tested before shipment
- Multi-level BMS monitoring cell voltage, current and temperature and reporting to the site controller
- Thermal management sized to hold cell temperature spread across the pack, which is what drives uneven ageing
Published Specification Data
These figures come from the manufacturer datasheet for this model. Where a value you need is not listed, ask for the full datasheet rather than assuming a typical figure.
| Rated power | 125 kW |
|---|---|
| Energy capacity | 261 kWh |
| Cooling | Liquid cooling |
| Ingress protection | IP54 |
Quality Control
- Insulation and dielectric withstand testing on completed assemblies
- Aged and burn-in run before packing, so early-life failures happen in the factory
- Serialised traceability from cell batch to finished unit
- Packing inspection and photo record before container loading
- Incoming inspection of cells, power electronics and structural parts before assembly
Customization Options
- Communication protocol mapped to the site's existing EMS or SCADA
- Cooling and ingress rating selected for the site climate
- Capacity and power rating configured to the site's measured load profile
- Grid code and AC voltage set for the destination market
How It Compares With The Alternatives
| A site-built battery room | The enclosure, thermal system and fire protection ship as one tested assembly, so the site does not have to build, ventilate and certify a room for them. |
|---|---|
| A diesel generator | Storage responds in milliseconds and has no fuel logistics, but it holds a finite energy budget - most industrial sites end up running both, with storage taking the peaks. |
| Grid connection upgrade | A capacity upgrade is a utility timeline the site does not control. Storage is a capital item the site can schedule itself. |
Getting This Product Right On Site
- 1
Send twelve months of interval meter data so the system is sized against the real demand curve, not the connected load
- 2
Confirm grid code, AC voltage and any export limitation required by the utility before production
- 3
Prepare a level foundation, cable routes and a clear service envelope around the enclosure
- 4
Commission with the supplier's sequence and record the baseline before the first billing cycle
- 5
Review the demand-charge line on the first two bills against the model and retune the dispatch schedule
All in One 125kw 261kwh IP54 Liquid Cooling ESS Cabinet - Buyer Questions
Can several units run in parallel
Do you support commissioning and after-sales on site
What is the minimum order quantity
What is the lead time on this system
Can the system be sized for our specific load profile
What certification does the system carry
Other BESS Power Storage Containers Models
All in One 125kw 261kwh IP55 Liquid Cooling ESS Cabinet125 kW / 261 kWh
View Product →
Lovsun 3.5MW-10MWH-22KV Liquid Cooling BESS3.5 MW / 10 MWh
View Product →
50KW/100KW 200KWH Outdoor All-in-one Ess Cabinet50-100 kW / 200 kWh
View Product →
50KW/100KWH Outdoor All-in-one Ess Cabinet50 kW / 100 kWh
View Product →Background For This Specification Decision
How thermal design affects cell temperature spread, and why that spread - not peak temperature - drives uneven ageing across a pack.
Read the guide →Installation GuideBESS Site Requirements and Shipping PreparationWhat a site needs ready before a containerised or cabinet storage system arrives, and what the shipment itself requires.
Read the guide →FAQ ArticleBattery Certifications Explained For Export BuyersWhat UN38.3, IEC62933, UL9540 and the CE marking each cover, and which one your shipment or your grid connection actually needs.
Read the guide →Factories, warehouses, cold stores and commercial campuses where the electricity bill is driven as much by demand charges as by consumption.
See the application →Utility Scale and Grid Side ProjectsGrid-connected storage and generation projects where the equipment is assessed on certification, dispatch behaviour and long-term degradation.
See the application →EV Charging and Mobile PowerCharging hubs and temporary power sites where the peak draw of simultaneous sessions exceeds what the local grid connection can supply.
See the application →Request A Quote For All in One 125kw 261kwh IP54 Liquid Cooling ESS Cabinet
Tell us the quantity, the destination market and the application. We reply within 12 hours with lead time, certification and pricing.
