Turnkey Project Delivery project delivery
Solution

Turnkey Project Delivery

Lovsun provides comprehensive services from solution design, equipment selection, installation and debugging through to operation and maintenance management, so a buyer states the requirement and receives a configured system rather than a parts list.

Stage By Stage

What Goes Wrong At Each Stage And What We Do About It

  1. 1

    Requirement and design

    The problem. A specification written from a nameplate figure produces a system that does not match the site.

    How we handle it. We work from load profile, site drawings, grid standard and budget, and return a configured design with the assumptions written down.

  2. 2

    Equipment selection

    The problem. Components chosen separately are compatible on paper and incompatible on site.

    How we handle it. Modules, inverters, storage and balance of system are selected against each other from one catalogue, with protocols verified before production.

  3. 3

    Production and quality control

    The problem. Batch variation shows up as mismatched performance after installation.

    How we handle it. Cells are graded and matched, every finished unit is function-tested, and units are serialised from cell batch to shipment.

  4. 4

    Packing and shipping

    The problem. Lithium shipments are delayed or rejected when the transport documentation is incomplete.

    How we handle it. Units are packed to UN38.3 transport requirements with the documentation the carrier needs, and loading plans are confirmed before booking.

  5. 5

    Installation and debugging

    The problem. Commissioning is where design assumptions meet the actual site.

    How we handle it. We supply the single-line diagram and commissioning sequence, and provide remote or on-site support depending on the scope agreed.

  6. 6

    Operation and maintenance

    The problem. Systems drift out of their optimal operating envelope without anyone noticing.

    How we handle it. Monitoring is configured at handover and reviewed with the site team, so performance is measured rather than assumed.

Turnkey Project Delivery - Project Questions

What information do you need to quote this
Load profile or billing history, site drawings or roof plan, the destination grid standard and the outcome you are targeting. With those four we can return a configured design rather than a price list.
How long does a project like this take
Lead time depends on configuration, quantity and grid approval in the destination market. Grid connection approval is usually the longest item and sits outside our control, so start it early.
Do you work with our EPC or installer
Yes. We supply the equipment, the design documentation and the commissioning sequence, and support your contractor remotely or on site depending on the scope agreed.
Can the system be expanded later
Yes, where the expansion is designed in from the start. Tell us the expected final size at the beginning so the conversion stage is specified with headroom rather than replaced.

Start With The Site Data Not The Product List

Load profile or billing history, site drawings, destination grid standard and the outcome you are targeting. With those four we can return a configured design.