Solar Plus Storage Microgrid project delivery
Solution

Solar Plus Storage Microgrid

Generation and storage specified against each other, running grid-tied, islanded or switching between the two, so a site keeps producing when the utility does not.

Stage By Stage

What Goes Wrong At Each Stage And What We Do About It

  1. 1

    Site assessment

    The problem. Roof or ground area, load profile and grid strength each cap the system independently.

    How we handle it. We work from the site plan, the load profile and the grid connection terms together, rather than sizing generation first and fitting storage afterwards.

  2. 2

    Generation design

    The problem. Available area often caps the system size before the budget does.

    How we handle it. TOPCon modules raise the watts per square metre, and multi-MPPT inverters let differently oriented roof sections share one unit.

  3. 3

    Storage sizing

    The problem. Storage that is too small never covers the evening load; too large and it idles.

    How we handle it. Capacity is set against the daily generation and consumption curves, with a defined expansion path rather than headroom bought up front.

  4. 4

    Transition and control

    The problem. Grid-tied to island transfer is where microgrid designs most often fail on site.

    How we handle it. Hybrid inverters and PCS are selected for the transfer behaviour the site needs and commissioned against it, not assumed from a datasheet line.

  5. 5

    Commissioning and handover

    The problem. A microgrid that nobody on site understands becomes a maintenance liability.

    How we handle it. We supply the single-line diagram, commissioning sequence and monitoring setup, and walk the site team through the control logic.

Solar Plus Storage Microgrid - Project Questions

What information do you need to quote this
Load profile or billing history, site drawings or roof plan, the destination grid standard and the outcome you are targeting. With those four we can return a configured design rather than a price list.
How long does a project like this take
Lead time depends on configuration, quantity and grid approval in the destination market. Grid connection approval is usually the longest item and sits outside our control, so start it early.
Do you work with our EPC or installer
Yes. We supply the equipment, the design documentation and the commissioning sequence, and support your contractor remotely or on site depending on the scope agreed.
Can the system be expanded later
Yes, where the expansion is designed in from the start. Tell us the expected final size at the beginning so the conversion stage is specified with headroom rather than replaced.

Start With The Site Data Not The Product List

Load profile or billing history, site drawings, destination grid standard and the outcome you are targeting. With those four we can return a configured design.