woodworking panel Automatic Spraying line UV PU paint
Full spray line that replaces 8 to 12 painting workers with a crew of three. Built to order.
View Machine Data →

Full spray line that replaces 8 to 12 painting workers with a crew of three. Configured for a full UV or PU primer and top coat sequence.





Configured for a full UV or PU primer and top coat sequence.
A complete automatic spraying line for primer and top coat on irregular shaped wood doors and kitchen cupboard fronts. The whole line replaces 8 to 12 painting workers and is run by three people. It takes UV, water based and PU paint, runs at 3-6 m per minute, needs a minimum 200 kW supply and occupies an 8 x 45 m working area.
Three operators run the line
Primer and top coat on irregular shaped doors and cupboard fronts in one line
UV, water based and PU paints all available
Consistent finish from the first door of the shift to the last
The whole spraying line replaces 8 to 12 painting workers
| Parameter | Value |
|---|---|
| Labour replaced | 8-12 painting workers |
| Workers needed | 3 persons |
| Line speed | 3-6 m/min |
| Minimum power | 200 kW |
| Working area | 8 x 45 m |
All machines can be customised to the buyer's requirement. Figures are the published data for this model series.
The profile line fits a 6 x 18 m area on 70 kW. This line is longer at 8 x 45 m and covers a fuller primer and top coat sequence
Eight to twelve painters replaced by a crew of three, with the finish no longer depending on who is on shift
Confirm an 8 x 45 m area and a 200 kW supply are available
Plan the line layout with our engineers before building work
Set each spray station for its coat in the sequence
Run sample doors and fix them as the quality standard

Full spray line that replaces 8 to 12 painting workers with a crew of three. Built to order.
View Machine Data →

90 and 180 degree return table that sends the panel back to the operator. Built to order.
View Machine Data →

Seals the underside of solid wood flooring so boards stop cupping in service. Built to order.
View Machine Data →

Disc brush sander that reaches into raised panel profiles and routed grooves. Built to order.
View Machine Data →
Yes. Configured for a full UV or PU primer and top coat sequence. Every machine is built to order, so the configuration is confirmed against your own panel size and coating system before production.
Three.
3 to 6 m per minute.
A minimum of 200 kW.
A working area of 8 x 45 m.
UV paint, water based paint and PU, for both primer and top coat.
The whole spraying line can replace 8 to 12 painting workers.