PHC piles are consumed in volume on port, highway and building foundation work. Casting them close to the job removes freight from the cost and puts the delivery date under the contractor own control.
PHC piles are consumed in volume on port, highway and building foundation work. Casting them close to the job removes freight from the cost and puts the delivery date under the contractor own control.

A full PHC pile line with end plate welding, tensioning, spinning and autoclave curing on automatic chain conveyor handling.
View details
Deformed steel rebar from 6 mm to 50 mm in coil, straight length or U shape, cut to the length you specify.
View details
Hardware and software that book finished products into stock automatically and give every unit a traceable QR code.
View details
An Industry 4.0 layer over the production line that collects process and material data in real time and shows it on a computer or phone.
View details
Customised fully automated plant with cutting edge technology, 400 poles per shift.
Read the project
First flagship pole and pile factory with cutting edge automated lines in the region, 600 units per shift.
Read the project
A pretensioned spun concrete pile follows the pole process closely until demoulding, then adds the stages that give PHC piles their strength. Knowing
Read the guide
The cage is the part of a pole or pile that a buyer never sees and an engineer never stops thinking about. Material shape, diameter and cut length dec
Read the guide
Zino sends the relevant standards documents to the end user with every turnkey line, so the plant works to the current version from the first casting.
Read the guideSend the volumes your market demands and the site you have available. You will get a configuration and a delivery scope back.