Turnkey Solution Provider of Concrete Pole and Pile Factories
Power and Telecom Pole Producers
Industry Application

Power and Telecom Pole Producers

Spun concrete poles carry distribution lines and telecom antennas in markets where steel towers are too expensive to import. Zino builds the factories that make them, from a 50 pole per shift starter plant to a 600 unit line running poles and piles together.

Pain Points In This Industry

  • Network rollout dates slip because poles are imported
  • Manual casting yards cannot hold a cycle time when demand doubles
  • Pole dimensions must satisfy a national standard the plant has never worked to
  • Labour cost per pole rises faster than the tariff the utility pays

What Buyers Actually Need

  • A line sized to the poles the network actually orders
  • Stable daily output that a project schedule can rely on
  • Design to GB 4623 or to the customer own national standard
  • A crew trained on the running line before mass production
Recommended Products

Equipment And Systems For This Industry

Typical Application Scenarios

  • Rural electrification programme needing distribution poles
  • Telecom operator securing local supply of square poles
  • Utility group localising pole production near the network

Delivery Capability

  • Outputs from 50 to 600 units per shift delivered on live projects
  • Site instruction for steel structure installation
  • Trial production before handover
  • 24 hour response guideline after start up

Solution Flow For This Industry

Confirm pole sections and output per shift
Plant layout and line design
Delivery and site instruction on steel structure
Equipment debugging and trial production
Operator training and mass production
Maintenance and servicing
Projects

Delivered Plants In This Industry

FAQ

Power and Telecom Pole Producers Questions

What output should a first pole plant target?
Delivered Zino projects range from 50 poles per shift in Jordan to 600 poles or piles per shift in Bangladesh, so the target is set from the network order book rather than from the equipment.
Which pole standard applies?
The default design standard is GB 4623 from China. Send your own national standard before design starts and it will be applied from the beginning.
Can you deliver a square pole line?
Yes. The Algeria project is an innovative square pole factory for the communication industry, producing 80 poles per shift.

Guides For This Industry

Plan A Plant For Power and Telecom Pole Producers

Send the volumes your market demands and the site you have available. You will get a configuration and a delivery scope back.