WOWLIVE · Bao'an District, Shenzhen, China Monday to Friday 08:00-18:00, Saturday 09:00-12:00 (GMT+8) +86 755 23062069 [email protected]
WiFi Hidden Cameras · WF-1080WBS

WiFi Bluetooth Speaker Camera WF-1080WBS

A bluetooth speaker with a digital clock display and a 1080P camera, running five to six hours on a 3000mAh cell and taking micro SD cards up to 128GB. It records while music is playing, which is the point of building a camera into a speaker.

  • Records while playing music, so the speaker keeps doing its job
  • 128GB card support, matched only by the desk lamp and two other models
  • Five to six hours of recording from 3000mAh
  • Speaker, clock with time and weather display, and camera in one body

One year warranty · PayPal, T/T or Western Union · DHL, UPS, FedEx or EMS

Who It Is For

  • Homes and offices where a bluetooth speaker is normal on a shelf
  • Short stay hosts covering a living area lawfully and with disclosure
  • Resellers needing a multi function unit that justifies its price

Problems It Solves

  • A single purpose object that nobody uses attracts attention
  • 32GB cards fill quickly at 1080P
  • Separate speaker, clock and camera means three objects in one room

Application Scenarios

  • A living area or kitchen where a speaker already sits
  • An office break room
  • A studio or workshop with music playing anyway
  • A shelf where a clock display is useful in its own right

Technical Features

  • High Definition: 1920x1080P
  • Motion Detection
  • Pinhole design,Looks like real drink bottle
  • Battery operated,Continue recording 5 to 6 hours
  • Support max 128GB micro SD card
Specifications

WF-1080WBS Technical Data

Taken from the factory specification sheet. Anything the sheet does not state is left out rather than estimated, and the FAQ below says which figures are still being confirmed.

Module NoWF-1080BSC
TypesWifi camera
RecordingContinue recording
ResolutionFHD 1080P
Megapixels5.0MP
View angle180 deg
Micro SD CardMax 128GB
Battery3000mah
Continue Recording5 to 6 hours
Comparison

How It Differs From The Closest Alternatives

Compared With The WF-1080DTC alarm clock

The WF-1080DTC is a clock only, 2500mAh and 3.5 hours. The speaker adds audio playback and 3000mAh.

Compared With The WF-720CUP cup camera

The cup runs 50 hours at 720P. The speaker runs five to six hours at 1080P with more functions.

Use Guide

Getting The Unit Into Service

  1. Charge or connect power first. Battery models should be fully charged before the first placement; mains models simply run from the socket.
  2. Fit a micro SD card within the stated limit. Fitting a card larger than the model supports will not work, and cards are not supplied unless the specification says otherwise.
  3. Place for the lens, then check the frame. Set the unit where it needs to see, record a short test clip and review it before leaving it in position.
  4. Check the legal position before use. Recording rules differ by country and by room, and audio is usually regulated more tightly than video.
Customisation

OEM And ODM Options

  • Housing printing with your own logo and artwork
  • Printed manual and insert in your own wording
  • Retail packaging produced to your artwork
  • Plug type, colour and card capacity variations where the model allows
Related Products

Other Models Buyers Compare With This One

Guides About This Kind Of Camera

Industries Buying This Model

Lawful Use Only

WOWLIVE products are supplied for lawful security and property protection. Laws on recording people, and on recording audio in particular, differ between countries and between rooms in the same building. Recording in places where people reasonably expect privacy, such as bathrooms, changing rooms and bedrooms that are not your own, is a criminal offence in most jurisdictions. Buyers and resellers are responsible for checking the rules that apply where the goods are used and sold, including any import, notification and signage requirements. We will not supply orders intended for unlawful surveillance.

Questions

WF-1080WBS Questions

Does it record while playing music?

Yes. That is stated in the factory specification.

What does the display show?

Time and weather.

How long does it run on battery?

Five to six hours from the 3000mAh cell. It also runs continuously on mains power.

What card size does it take?

Micro SD up to 128GB.

Get Pricing On The WF-1080WBS

Send us the quantity and destination country for the WiFi Bluetooth Speaker Camera WF-1080WBS and we will come back with a price, a lead time and a shipping option.