Importers And Wholesalers
An importer's margin lives in the container, not in the unit price. A ten percent better price on an item that loads badly is a loss, which is why every item page on this site publishes carton dimensions, pieces per carton and the loading quantity for a 20FT, 40GP and 40HQ.
What Goes Wrong In This Channel
- Suppliers who quote FOB unit price but not carton volume
- Nesting claims that do not survive the real packing
- Mixed loads that arrive under filled because figures were estimated
- Late changes to master carton size that void a load plan
What Has To Be True Instead
- Published carton and loading data before quotation
- Deep nesting items to balance a load of bulky items
- Clear terms on what changes to the carton will cost
- A wide catalogue so one container can carry a full assortment
Twelve Categories That Fit This Channel
Chosen from the 76 categories in the catalogue because they answer the pain points above, not because they are the cheapest to make.

Plastic Basin
12 items online
Bucket And Pail
12 items online
Plastic Basket
12 items online
Clothes Hanger
12 items online
Clothes Pegs And Clips
12 items online
Plastic Storage Container
12 items online
Plastic Bowl
12 items online
Plastic Cup Mug And Glass
12 items online
Trash Bin With Lid
12 items online
Water Ladle
9 items online
Plastic Plate And Tray
12 items online
Desk And Food Cover
8 items onlineThe Sequence For This Kind Of Programme
Questions From This Channel
Are the loading figures on the item pages reliable?
They come from the packing specification for that item, the same figures our own loading team works from. If a master carton is changed for your order the figures change with it and we will reissue them.
Can I mix items from different categories in one container?
Yes, and that is how most orders here are built. The minimum is 3000 pcs per design per item and not less than US$5,000 per item.
What is your minimum order quantity?
3000 pcs per design per item, and not less than US$5,000 per item. A mixed order of several items is normal and is the usual way a first container is put together.
What are your price terms?
FOB Shantou for orders above 25 CBM. For LCL or FCL below 25 CBM the term is Ex-work Shantou plus handling charge. If you need FOB Shenzhen there is a transport fee of US$600 per container from the factory to Shenzhen port. Quotations are valid for one month.
How long is production?
30 to 40 days after all details are confirmed, for one 20GP. Decal plate set up adds 10 to 15 days and runs in parallel where possible.
Send Your Brief And We Will Answer With Data
Item numbers or categories, quantities and destination port. You get unit prices, carton figures and container loading quantities back.