Yuyao Ningbo ChinaFactory Since 2001
Solution

Mould Development and Tooling

Mould development and tooling are handled in-house at Yuyao LOL Commodity Package, allowing direct control over new product shapes and modifications to existing tooling without relying on third-party suppliers. This capability supports faster turnaround and tighter alignment with packaging design needs, especially for custom or evolving product lines. All mould-related work is managed internally from concept to completion, ensuring consistency and traceability across production runs.

Three cylindrical cosmetic packaging tubes in silver, dark purple, and pink standing upright on a light grey background.
Step By Step

What Happens At Each Stage

Prototype Validation

The first prototype does not match the intended design, requiring multiple revisions and extended lead times.

We produce a prototype from the new or modified mould and send it to the buyer for approval. Adjustments are made internally before final tooling is finalized.

Production Integration

A new or updated mould is not ready when production starts, delaying the launch of a new product line.

The mould is completed and verified before production begins. Once approved, it is scheduled directly into the production line to ensure on-time delivery.

Export Packing Planning

The buyer cannot plan freight or container loading until the carton count and packing configuration are confirmed.

After tooling is complete, we quote the inner-box count and export carton count for the new product. These values are fixed and included in the quotation for freight planning.

FAQ

Mould Development and Tooling Questions

Do you modify existing tooling for changes in design or size?

Yes. We can adapt existing moulds for minor or major changes in shape, capacity, or interface. The modification is done internally with no third-party involvement.

Are carton counts and packing details included in the mould development quote?

Yes. Once the mould is finalized, we provide the inner-box count and export carton count for the new product. These are quoted on request and used for freight planning.

How long does mould development take?

The timeline depends on the complexity of the design and whether it is a new mould or a modification. We provide a lead time estimate after design confirmation.

Can I see a prototype before the mould is finalized?

Yes. We produce a prototype from the mould and send it for approval. Revisions are made internally until the design meets your expectations.

Mould Development and Tooling

Send a reference sample, a drawing or a colour chip and we will tell you what tooling it needs before you commit.