Shenzhen Mastarled Co., Ltd · Shenzhen, China [email protected] +86-755-8652 6281
100sqm Indoor Rental LED Screen in Dubai UAE

100sqm Indoor Rental LED Screen in Dubai UAE

25x4m, 100sqm · Model MSR-XI-2 · Dubai, United Arab Emirates · Delivered 2013

Product ModelMSR-XI-2
Screen Size25x4m, 100sqm
LocationDubai, United Arab Emirates
Delivered2013
Product SuppliedRental LED Screen A Series
SectorRental and Staging Companies
Who It Was For

Client Background

The buyer is not named in our project records. What is documented is the screen itself: a 100sqm indoor rental wall supplied on MSR-XI-2 cabinets for an event in Dubai, United Arab Emirates, in 2013. A wall of that size on rental cabinets is bought by a rental and staging operation rather than by a venue.

Challenge

The Project Challenge

Build a 100sqm indoor rental screen that can be assembled and struck quickly, with no rear access required, and that maintains consistent brightness and colour across all cabinets during a multi-day event.

Pain Points

Customer Pain Points

  • 100sqm is a large indoor wall to install and dismantle within a tight event schedule
  • Cabinets that require tools or shimming will delay setup and increase labour time
  • Front maintenance is required because the screen is mounted against a wall with no rear access
  • Brightness and colour must match across all cabinets without visible steps during the event
Solution

Our Solution

The wall was supplied on indoor rental cabinets from the XI Series: die-cast aluminium at 24 to 26kg per square metre in 500x500mm and 500x1000mm formats, with a fast lock system for tool-free assembly, front access for module replacement, and a hanging structure compatible with truss rigging. The cabinets were designed for indoor use with high refresh rate and consistent colour across the wall.

How It Was Built

Manufacturing Process

  • SMT placement and reflow soldering of the LED modules
  • Soldering inspection and module ageing test before assembly
  • Cabinet assembly and flatness alignment on the assembling line
  • Screen installation test with the cabinets built up as a wall
  • Screen ageing test before the wall was dismantled and packed
Supply Chain

Supply Chain Coordination

Cabinets were packed together with spare modules, receiving cards and power supplies so the crew had field spares from the first event rather than waiting on a second shipment.

Testing

Quality Control

Modules passed soldering inspection and an ageing test, and the cabinets were built up as a wall in the factory for a screen installation test and a screen ageing test, which is what matches brightness and colour across cabinets before they ship.

Result

Final Result

Documented delivery: 100sqm of MSR-XI-2 indoor rental screen, supplied for Dubai, United Arab Emirates, in 2013.

Benefit

Customer Benefit

Tool-free fast lock rigging reduces setup and strike time, and factory-matched cabinets ensure consistent brightness and colour across the wall without visible steps during the event.

Planning Something Similar

Send the wall size, the viewing distance and the site conditions and we will come back with the product and the cabinet layout.