Shenzhen Mastarled Co., Ltd · Shenzhen, China [email protected] +86-755-8652 6281
150sqm Indoor Rental LED Screen in Dubai

150sqm Indoor Rental LED Screen in Dubai

150sqm · Model MSR-XI-3 · Dubai, United Arab Emirates · Delivered 2014

Product ModelMSR-XI-3
Screen Size150sqm
LocationDubai, United Arab Emirates
Delivered2014
Product SuppliedRental LED Screen K Series
SectorRental and Staging Companies
Who It Was For

Client Background

The buyer is not named in our project records. What is documented is the screen itself: a 150sqm indoor rental wall supplied on MSR-XI-3 cabinets for an event in Dubai, United Arab Emirates, in 2014. A wall of that size on rental cabinets is bought by a rental and staging operation rather than by a venue.

Challenge

The Project Challenge

Build and strike a 150sqm indoor LED wall in a tight event timeline, where cabinets must be installed and removed quickly without tools, and the wall must maintain a seamless visual appearance across all panels.

Pain Points

Customer Pain Points

  • 150sqm is a large indoor wall to install and strike within a single event window
  • Cabinets that require tools or shimming will delay setup and increase crew time
  • A rental wall must survive repeated rigging and disassembly without frame distortion
  • The wall must maintain visual consistency across all panels despite being reassembled at different venues
Solution

Our Solution

The wall was supplied on indoor rental cabinets from the K Series: die-cast aluminium at 28kg per square metre in 500x500mm and 500x1000mm formats, with a hanging structure for truss rigging and ground support, fast lock with high precision positioning, angle adjustment for curved builds, and front and rear access so a module can be replaced from either side.

How It Was Built

Manufacturing Process

  • SMT placement and reflow soldering of the LED modules
  • Soldering inspection and module ageing test before assembly
  • Cabinet assembly and flatness alignment on the assembling line
  • Screen installation test with the cabinets built up as a wall
  • Screen ageing test before the wall was dismantled and packed
Supply Chain

Supply Chain Coordination

Cabinets were packed together with spare modules, receiving cards and power supplies so the crew had field spares from the first event rather than waiting on a second shipment.

Testing

Quality Control

Modules passed soldering inspection and an ageing test, and the cabinets were built up as a wall in the factory for a screen installation test and a screen ageing test, which is what matches brightness and colour across cabinets before they ship.

Result

Final Result

Documented delivery: 150sqm of MSR-XI-3 indoor rental LED screen, supplied for Dubai, United Arab Emirates, in 2014.

Benefit

Customer Benefit

Tool-free fast lock rigging enables rapid installation and strike of a large wall, and factory-matched cabinets ensure consistent brightness and colour across all panels when modules are swapped between events.

Planning Something Similar

Send the wall size, the viewing distance and the site conditions and we will come back with the product and the cabinet layout.