Kazakhstan — Logistics Cold Storage
Large logistics cold storage — winter-hardened design for Central Asia.
- Large logistics
- -18℃ to -25℃
- 150 days
- 2023
Background And Requirement
A 500-ton CA cold storage built for a Kazakh apple-growing cooperative in the Almaty region. Kazakhstan's Aport apple variety is world-renowned for its flavour and keeping quality, but was traditionally sold only during the 3-month harvest season due to lack of long-term storage. This CA facility transforms the business model into year-round supply.
Howcool handled full EPC: engineering in Beijing, container shipment of all equipment, on-site installation by our Kazakhstan-based team in Almaty, and local operator training. The entire project — from first drawing to operational handover — was 150 days including international shipping.
This project established Howcool's physical presence in Central Asia. Our Kazakhstan office in Almaty (64A Utegen Batyr Street) now provides ongoing service, spare parts, and support for this and subsequent regional projects.
Project Facts
| Location | Kazakhstan |
|---|---|
| Capacity | Large logistics |
| Temperature | -18℃ to -25℃ |
| Programme | 150 days |
| Completed | 2023 |
| Sector | Export / International |
Large logistics cold storage in Kazakhstan. Winter-hardened design for -40℃ ambient, additional insulation on pipelines, heated condenser pits.
How The Project Was Delivered
- 01
Engineering (Beijing)
CA parameters specific to Aport apple variety. 500-ton capacity with 4 partition rooms. Design adapted for Kazakh electrical standards (380V/50Hz, TN-S earthing).
- 02
Container Shipment
All equipment packed in 5 shipping containers. Rail transport Beijing → Almaty (14 days). Customs clearance handled by Howcool's Kazakhstan team.
- 03
On-Site Installation
Howcool's Almaty-based team installed panels, doors, refrigeration, CA equipment. 60 days on site. Local civil contractor built the shell under Howcool's supervision.
- 04
Training & Handover
Kazakh-language operator manual. 2-week training of cooperative's maintenance staff. Ongoing support from Almaty office.
What Was Supplied
- Bitzer semi-hermetic parallel rack
- Air-cooled condenser (designed for Almaty climate)
- Dual-discharge air coolers × 4 (one per partition)
- 100mm PU gas-tight insulation panels — 420 m²
- 4× CA cold storage doors
- Nitrogen generator (PSA, 25 Nm³/h)
- CO₂ scrubber (lime-based)
- O₂/CO₂ analyser with 4-point sampling
- Humidification (ultrasonic, 90-95% RH)
- Remote monitoring with Russian-language interface

Results At Handover
Aport Apples
Year-round Aport apple supply to Kazakh retail + export markets.
Sales Window
Extended from 3-month harvest to 12-month supply via CA storage.
Almaty Office
Established Howcool's Kazakhstan presence for ongoing service.
Photographs From Site


Questions About This Project
How large is the Kazakhstan project?
Large logistics, located in Kazakhstan.
What temperature does the facility operate at?
-18℃ to -25℃.
How long did the project take?
150 days, completed 2023.
What equipment was supplied?
Key items included bitzer semi-hermetic parallel rack; air-cooled condenser (designed for almaty climate); dual-discharge air coolers × 4 (one per partition). Full equipment lists are issued with the design pack.
Can Howcool deliver a similar facility for us?
Yes. Send your storage volume or tonnage, target temperature, product type and site location, and our engineers will return a preliminary design and budget estimate within 48 hours.
Products From This Project Type

Hermetic Condensing Unit
Versatile unit with main control board, temperature control and operation board in one convenient package.

PU / PIR Cold Room Panels
Cam-Lock and Plug-in sandwich panels with polyurethane core and color-coated steel. 15-20 year lifetime.

Plug-in Modular EPS Panels
Cost-effective modular EPS panels with tongue-and-groove joints. Ideal for small commercial cold rooms and quick installations.

Multi-Compressor Pack
Multiple compressors in parallel sharing discharge, suction, condenser and receiver for larger cooling capacity.
Similar Facilities We Have Built
Oman — 3,000-Ton Cold-Chain Logistics Center
Feasibility-stage EPC proposal for a 3,000-ton multi-functional agricultural cold storage in Oman — a multi-temperature facility combining chilled produce, frozen meat and seafood, and a blast-freezing tunnel, delivered in 6–7 months on a China-supply plus local-steel model.
Iraq — 5,000-Ton Cold-Chain Logistics Cold Storage
Feasibility-stage EPC design for a modern 5,000-ton public cold-chain logistics hub near Basra Port — built to close Iraq's critical shortage of professional low-temperature storage for imported food, local produce and pharmaceuticals.

Uzbekistan — Cold Chain Logistics Facility
Large-scale cold-chain logistics facility — Belt & Road Initiative partner.
Planning Something Similar
Send your volume, temperature, product type and location. Our engineers respond within 24 hours with a preliminary design.