





A 10 foot D-Sub 25 pin male to male serial cable using tinned copper conductors. Industrial machines with RS232 control ports outlive the computers that drove them, so a reliable replacement cable in a specified length keeps older lines running.
Samples ship within 3 days of confirmation. Bulk lead time is typically 7 to 12 days.
| Connector | D-Sub 25 pin male to male |
|---|---|
| Wire Gauge | 26AWG |
| Conductor | Tinned copper |
| Length | 10 feet |
| Application | RS232 serial |
Values shown are the standard build. Connector family, conductor gauge, circuit count and finished length are all build options.
The company is certified to IATF 16949 and UL standards. Samples are confirmed prior to trial or mass production, and the approved sample is the reference for every repeat order.
A straight-through 25 pin build keeps the original equipment pinout intact
A direct cable avoids driver dependence on the host computer
Process Equipment Wiring Harness
Microfit 3.0mm MX3.0 22 Pin Male Harness Wire22-circuit Microfit 3.0mm harness for robots, storage systems and medical electronics
View Specifications
Process Equipment Wiring Harness
Molex KK 396 and JST XH 3.96mm Pitch Cable Assembly2, 3 and 4 pin VH3.96 housing assemblies for electronics power and control
View Specifications
Process Equipment Wiring Harness
JAE 36 Pin Industrial Control Cable With PVC Insulation36-circuit JAE control cable for internal communication in new energy equipment
View SpecificationsWhat a harness manufacturer actually needs from you before a quotation means anything, and what happens when those details are missing.
Process GuideContinuity, circuit configuration, terminal retention and ingress protection, and what each one catches that the others do not.
Material GuideThree cable constructions that cover most harness work, and how to tell which one your application needs.
Yes. Send the pin-to-pin table or a sample cable and we build to it.
Yes. 10 feet is the standard build and other lengths are quoted on request.
Sample orders ship within 3 days of confirmation. Production lead time for bulk orders is typically 7 to 12 days, and we confirm the date against your quantity when we quote.
Products are typically individually packed in PE bags and then boxed according to the specified quantity. Tell us any special packing requirement when you place the order.
Samples are charged for the sample and the shipping. The cost and the timing are confirmed with your quotation before anything is built.
Tell us the quantity, the finished length and any change to the connector set. We come back with the price, the lead time and a sample plan.