Dubai Water Main Rehabilitation

Pressure water main rehabilitation in central Dubai using PE-coated flexible reinforced tube. Sanitary compliance and pressure-rating retention were the controlling project requirements.

Dubai Water Main Rehabilitation
Project Facts

At a glance

LocationDubai, United Arab Emirates
SectorPotable Water Supply
MethodFlexible Reinforced Tube
DiameterDN400 – DN800
Length1,850 meters of pressure water main
Duration6 weeks
Host PipeSteel water main, age 35 years
The Challenge

Project context

Dubai Municipality required rehabilitation of a 35-year-old steel potable water main running beneath major arterial roadways. The conveyed water was sourced from desalination plants and required full sanitary compliance. Existing pressure rating had to be preserved post-rehabilitation, and the project had to be completed during the cooler winter months to minimize impact on residential water supply.

Our solution

Huatao supplied the dedicated water-supply variant of our Flexible Reinforced Tube, with PE coating compliant with potable water sanitary standards. Pull-in installation through manhole entries preserved existing road surface intact. Wall thickness of 7-8 mm provided structural reinforcement while retaining pressure capacity. The sealed annular hose construction ensured zero leakage post-curing.

Outcomes

  • 1,850 meters of DN400–DN800 water main rehabilitated trenchlessly
  • 6-week project window matched seasonal water-demand low period
  • Full pressure rating retention verified through hydrostatic testing
  • Sanitary compliance certified for potable water service
  • Zero excavation on arterial roadways
  • Service interruption limited to nighttime windows by segment

Have a similar project?

Send us your pipeline drawings and condition data — we'll respond with a method recommendation, materials list, and budget estimate.

Request a Project Consultation