Process explainers, method comparisons, and engineering reference articles — everything you need to specify, design, and execute a successful CIPP rehabilitation project.
Step-by-step explanations of each rehabilitation method — from UV-CIPP to short pipe replacement.
Pre-formed PVC liner pull-in with heat-and-pressure expansion — DN150 to DN1000
Read process
Live-flow trenchless rehabilitation for large-diameter pipes and box culverts
Read process
Cement mortar + polyurethane spray-lining for structural and corrosion repair
Read process
In-situ replacement of small-diameter drainage pipes using HDPE short pipes
Read processSide-by-side comparison articles helping engineers select the optimal rehabilitation method for project conditions.
Trenchless rehabilitation versus traditional dig-and-replace
Compare methods
Selecting between polyester felt and woven fiberglass reinforcement
Compare methods
Choosing among the three major trenchless rehabilitation methods
Compare methodsPractical engineering references for CIPP project specification, sizing, and acceptance testing.
Engineering reference for matching CIPP liner diameter to host pipe ID
Read article
Twenty common questions about CIPP — answered by our engineers
Read articleOur engineering team produces method recommendations, sizing analyses, and BOMs tailored to your project conditions.
Talk to Engineering