Pneumatic Inversion System

Vehicle-mounted pneumatic inversion + steam curing — up to 300m per operation

Pneumatic Inversion System — Vehicle-mounted pneumatic inversion + steam curing — up to 300m per operation
Equipment

Pneumatic Inversion System

The vehicle-mounted pneumatic inversion system allows for precise control of inversion pressure and travel speed, accurately positioning the CIPP repair liner within the pipe designated for rehabilitation.

Long-segment sewer rehabSteam-cured CIPP projectsHighway crossingsInaccessible terrain
Request Quote WhatsApp Us
Description

About this product

The vehicle-mounted pneumatic inversion system allows for precise control of inversion pressure and travel speed, accurately positioning the CIPP repair liner within the pipe designated for rehabilitation.

Featuring an advanced inversion drum design, the system ensures zero pressure loss during the inversion process, guaranteeing the smooth and safe execution of long-distance inversion operations.

This integrated engineering vehicle combines both the liner inversion system and the steam curing system; it facilitates a rapid transition from the inversion phase to the steam curing phase, enabling the rehabilitation of pipe sections up to 300 meters in length in a single operation.

Key features

  • Precise inversion pressure and speed control
  • Zero pressure loss during inversion
  • Long-distance installation capability
  • Integrated inversion + steam curing on one vehicle
  • Rapid phase transition saves project time
  • Single-operation coverage of 300m sections
Technical Specifications

Detailed Specs

Inversion MethodPneumatic (compressed air)
CuringIntegrated steam curing
Single OperationUp to 300 m
Pressure ControlPrecision regulation
Pressure LossZero during inversion
Form FactorVehicle-mounted
Gallery

Product Imagery

Applications

Where this product is used

Long-segment sewer rehab

Recommended for long-segment sewer rehab projects requiring trenchless rehabilitation.

Steam-cured CIPP projects

Recommended for steam-cured cipp projects projects requiring trenchless rehabilitation.

Highway crossings

Recommended for highway crossings projects requiring trenchless rehabilitation.

Inaccessible terrain

Recommended for inaccessible terrain projects requiring trenchless rehabilitation.

Related Products

You may also need

UV-Curing System Vehicle
Equipment

UV-Curing System Vehicle

Container-mounted UV curing rig — 3 light trains, DN200–DN2200

View product
Inversion Drum
Equipment

Inversion Drum

CIPP inversion drum — stainless or carbon steel, max 2.0 bar / 120°C

View product
Cementitious Lining Equipment
Equipment

Cementitious Lining Equipment

Spray-on mortar + polyurethane composite repair vehicle — for pipes, manholes, culverts

View product

Ready to specify Pneumatic Inversion System for your project?

Get pricing, drawings, and lead time directly from our engineering team.

Request a Quote