The Strong Link in Your Grid — porcelain insulators from Pingxiang, Jiangxi, China

Overhead Transmission Lines

Transmission lines are built once and maintained for thirty years, so the insulator decision is really a maintenance decision taken decades in advance.

Porcelain insulator shells on kiln cars entering the tunnel kiln at the Baolifeng plant
Inside the Baolifeng plant in Pingxiang, Jiangxi, where every insulator supplied to this sector is formed, fired and tested.

What gets in the way

The four problems this sector brings us

String reliability over decades

A disc with a high deterioration rate turns a planned inspection interval into an unplanned outage. Our U70 series publishes annual deterioration rates of 0.04, 0.01 and 0.005 %.

Coupling discipline across a fleet

Long lines get built in sections by different contractors. We supply the same 70 kN disc in 16 mm and 16C couplings so a network can standardise electrically without forcing one coupling everywhere.

Tender compliance

Each batch ships with quality certificates, material certificates and test reports, which is what project acceptance actually asks for.

Delivery against a construction programme

Stringing crews are the expensive resource. Bulk order logistics are planned per project, with real-time tracking, so discs land before the towers are ready rather than after.

Answers

Overhead Transmission Lines: questions we are asked

What voltage levels do you supply for?

Our core voltage capability covers systems up to 500 kV AC and 400 kV DC. The products listed on this site are the distribution and sub-transmission range; send us your line voltage and we will confirm what we can supply.

How many discs per string should we plan for?

As a planning reference, around 10 units per string at 110 kV and 20 or more at 500 kV, adjusted for pollution class and altitude. We will work the configuration through with your line design.

Do you provide on-site support during stringing?

For large projects we send engineers for on-site installation, debugging and construction guidance.

Working on a overhead transmission lines project?

Send the line data and quantity schedule. Our engineers will come back with a selection, a documentation package and a delivered price.