
Export Packing & Shipping
Equipment that arrives in the condition it left the workshop in.
Why This Exists
Export Packing & Shipping In Practice
Large vessels, cranes and machined parts fail in transit for predictable reasons. Packing is specified for the actual journey, and documents are prepared for the actual destination.
Stage By Stage
What Happens And What It Prevents
Packing Design
Standard crates are used for non-standard equipment.
Frames and crates are built around the item, with lifting points marked.
Corrosion Protection
Machined and polished surfaces arrive with rust bloom.
Protective film, desiccant and sealed wrapping sized to the transit time.
Loading Plan
Oversized vessels are discovered to be out of gauge at the port.
Dimensions are checked against container or flat rack limits before booking.
Documentation
Customs holds the shipment over paperwork details.
Invoice, packing list and certificate of origin prepared to your destination's requirements.
Consolidation
Part shipments arrive weeks apart and installation stalls.
Items are held and released together so the installation crew has everything.
Related Products
Typical Items In This Kind Of Project
Stainless Steel TanksHerbal & Tea Extraction Tank
Model HTK-CQG-01 extraction tank from 1000 L to 5000 L, built in SUS304 or SUS316L. It extracts herbal or tea liquor…
View Product
Beer Brewing EquipmentBright Beer Tank
Model HTK-BQJG-01 bright beer tank, also called a serving tank or clear beer tank, in volumes from 1 to 200 BBL and…
View Product
Beer Brewing EquipmentBeer Fermentation Tank
Model HTK-BFJG-01 beer fermentation tank, also called a uni-tank, in volumes from 1 to 200 BBL and built in SUS304 or…
View Product
Overhead Cranes10 Ton Overhead Crane
A 10 ton double beam overhead crane built to your bay rather than to a catalogue model. Two builds are offered: a…
View Product
Overhead Cranes15 Ton Overhead Crane
A 15 ton crane for bays that span roughly 36 to 50 metres, offered in light and winch double beam builds. The light…
View Product
Overhead Cranes20 Ton Overhead Crane
A 20 ton crane offered in three builds: a light double beam crane for general industrial and light construction…
View Product
Packaging MachinesPalletizer
Model HTK-MDJ-01 palletizer running at 20 to 80 cartons per minute, customised to the line speed. It uses full…
View Product
Packaging MachinesCarton Packing Machine
Model HTK-ZXP-01 carton packing machine running at 25 to 60 cartons per minute, with the working speed set to the…
View Product
Packaging MachinesDepalletizer
Model HTK-XDJ-01 depalletizer running at 500 to 1200 containers per minute, customised to the line. It unloads…
View ProductQuestions
Frequently Asked Questions
Where does this process start?
With a written specification. Until the requirement is written down, quotations from different factories cannot be compared, because they are not answering the same question.
Do you charge for the sourcing work separately?
Tell us the scope at enquiry and we will be clear about how the commercial arrangement works before any work starts.
What happens if the goods fail inspection?
They do not ship. The problem is raised with the factory in Shanghai, where it costs a fraction of what it costs after the container has sailed.
Can you work with a factory we have already found?
Yes. Inspection, specification control and consolidation can be applied to a supplier you already use.
How long does the process take?
It depends on the product and whether tooling is involved. We confirm a schedule in writing with the quotation rather than quoting a standard lead time.
Start With Export Packing & Shipping
Describe what you are trying to buy or build. We will tell you what information is missing before anyone can quote it properly.
