Portable Water Bottle Camera DVR-1080WWB
Food grade PET, so the bottle can hold a drink and still look normal on a table











A food grade PET bottle with a 1080P pinhole recorder and a dismountable camera assembly. Two hours of charging gives 150 minutes of recording to a micro SD card up to 64GB.
One year warranty · PayPal, T/T or Western Union · DHL, UPS, FedEx or EMS
Taken from the factory specification sheet. Anything the sheet does not state is left out rather than estimated, and the FAQ below says which figures are still being confirmed.
| Module No | DVR-1080SWB |
|---|---|
| Types | DVR(No Water inside) |
| Recording | Continue recording |
| Resolution | FHD 1080P |
| Megapixels | 3.0MP |
| View angle | 65 deg |
| Micro SD Card | Max 64GB |
| Battery | 400mah |
| Continue Recording | 150minutes |
Same 400mAh cell and 150 minute runtime. This model takes 64GB cards against 32GB.
Same core specification in a slimmer body. Choose on the shape that suits your market.
Food grade PET, so the bottle can hold a drink and still look normal on a table
Slim profile that fits a vehicle cup holder or a bag side pocket
PIR standby of 15 to 20 days from two 2000mAh cells, so a card does not fill with an empty room
1080P video at 30fps and 5MP stills from a body the size of a memory stick
The single decision that shapes every other one. Live view from anywhere, or a recorder that works with no network at all.
Why one camera lasts 15 days and another lasts eight hours on a similar battery, and how to choose between them.
One Supplier Covering A Whole Covert Camera Catalogue
Cover A Till Point Or A Stockroom Without A CCTV Contract
Check An Unoccupied Property Without Driving To It
WOWLIVE products are supplied for lawful security and property protection. Laws on recording people, and on recording audio in particular, differ between countries and between rooms in the same building. Recording in places where people reasonably expect privacy, such as bathrooms, changing rooms and bedrooms that are not your own, is a criminal offence in most jurisdictions. Buyers and resellers are responsible for checking the rules that apply where the goods are used and sold, including any import, notification and signage requirements. We will not supply orders intended for unlawful surveillance.
Yes. Food grade PET with a removable camera assembly so the bottle can be washed.
150 minutes from a two hour charge.
Micro SD up to 64GB.
Yes. Label and packaging customisation is standard OEM work here. Send artwork and quantity for a quote.
Send us the quantity and destination country for the Mini Drink Bottle Camera DVR-1080WBS and we will come back with a price, a lead time and a shipping option.