ODM Product Development
Start from a platform that already works, change what your brand needs, and skip the part of the schedule where a new product is proven from zero.
Most programmes do not need a new product. They need an existing, validated product to look and feel like the buyer's brand. Our research and development department provides new product designs by combining science and research functions with the platforms already running on our lines, which is what shortens the schedule.
An ODM programme normally changes the housing, the finish, the light treatment, the key legend and the packaging, and leaves the board, the atomiser or the motor alone. That keeps the certification, the reliability history and the spare-parts list intact.
At A Glance
- ISO 9001:2015 certified quality system
- 200+ employees, 30,000 m2 facility
- Samples in 1-5 days
- Reply within 1 hour
- Defective rate within 0.3-0.8%
- 1 year quality guarantee
How It Runs Step By Step
Requirement analysis
We take your target price, target market and the specification your buyer has committed to, and identify which of our platforms can carry it.
Design
The R and D team works up the housing, finish and control layout against your brand direction.
Sample
Samples are prepared in one to five days and sent for your confirmation.
Tooling
Tooling is cut only for the parts that actually change.
Pilot production
A pilot run goes through the normal line and the normal inspection gates, not a special build.
Mass production
Full production with IQC, IPQC, FQC and warehouse QA.
The Plant Behind This Service

Surface-mount line placing components on the control boards that go into every diffuser, toothbrush, purifier and adapter we build.

Wave soldering station for through-hole components and connector headers on power and control boards.

One of the dust-free automatic production lines built up as the plant moved from manual to semi-automatic assembly.

Operator assembly station with per-station in-process quality control, so a defect is caught where it is created.

Second assembly line running a separate programme in parallel with the first.

Line layout showing the flow from component feed through assembly to final inspection.
Talk To Someone Who Builds This Product
Send the model, the quantity and the market. You get an answer within 1 hour, and a sample in 1-5 days.
ODM Product Development FAQ
How long does an ODM programme take?
Do you charge for samples?
Can we visit before we place the order?
Start With A Conversation Not A Form
Tell us what you are building and where it sells. We answer within 1 hour.
