Factory Tour

Our Production Line

From the beginning we have run a scientific quality control system and a rigid inspection procedure, strictly implementing ISO 9001.

We have established several dust-free automatic production lines by relying on advanced manufacturing technologies and gradually connecting to the world through a series of management reforms. We provide systematic and integrated solutions ranging from design, manufacturing and assembly to after-sales services.

In addition, we can rapidly optimise purchases, smoothly achieve logistics and effectively reduce costs. We have established a quick market response capability and a sales network distributed across the globe.

In House Capability

  • SMT placement on our own line
  • Wave soldering for through-hole parts
  • 100 percent PCBA testing
  • Dust-free automatic assembly lines
  • Segregated rework area
  • Electrical test and aging test benches
  • Automatic packing and warehouse QA
  • R and D office on the same site
Photographs

Every Photograph Captioned

Sixteen photographs of our own plant. Each caption says what the picture shows and why it matters to your order.

SMT Line at TECHOM Electronics
SMT Line
Surface-mount line placing components on the control boards that go into every diffuser, toothbrush, purifier and adapter we build.
Wave Soldering at TECHOM Electronics
Wave Soldering
Wave soldering station for through-hole components and connector headers on power and control boards.
Assembly Line at TECHOM Electronics
Assembly Line
One of the dust-free automatic production lines built up as the plant moved from manual to semi-automatic assembly.
Assembly Station at TECHOM Electronics
Assembly Station
Operator assembly station with per-station in-process quality control, so a defect is caught where it is created.
Second Assembly Line at TECHOM Electronics
Second Assembly Line
Second assembly line running a separate programme in parallel with the first.
Line Layout at TECHOM Electronics
Line Layout
Line layout showing the flow from component feed through assembly to final inspection.
Rework Area at TECHOM Electronics
Rework Area
Segregated rework area. Units that fail in-process inspection are pulled here rather than passed down the line.
Test Equipment at TECHOM Electronics
Test Equipment
Electrical test equipment used for PCBA testing before assembly continues.
Test Bench at TECHOM Electronics
Test Bench
Test bench used for functional checks and aging tests on finished assemblies.
Production Floor at TECHOM Electronics
Production Floor
Production floor of the plant between QingXi Town, Dongguan and XiangAn Industrial Park, Xiamen.
Component Staging at TECHOM Electronics
Component Staging
Component staging ahead of the line. Materials reach this point only after passing incoming quality control.
Automatic Packing at TECHOM Electronics
Automatic Packing
Automatic packing station. Packed goods are inspected again in the warehouse before delivery.
Packing Line at TECHOM Electronics
Packing Line
Packing line feeding the warehouse, where the final quality assurance inspection takes place.
R and D Office at TECHOM Electronics
R and D Office
The research and development office. New product design work starts here before any tooling is cut.
Engineering Desks at TECHOM Electronics
Engineering Desks
Engineering desks inside the R and D department that supports OEM and ODM programmes.
Sales and Support Office at TECHOM Electronics
Sales and Support Office
The office team that answers enquiries within one hour and runs order follow-up.
Quality Control

Four Inspection Stages Between A Raw Material And Your Container

25 QC staff run these stages under an ISO 9001:2015 system.

IQC - Incoming Quality Control

Tests the physical and chemical performance of every raw material and records supplier quality. Materials that meet the standard go to the warehouse; those that do not are rejected.

IPQC - In-Process Quality Control

QC stations are set up at every process step on the line so that a defect is caught at the station that created it rather than at final assembly.

FQC - Final Quality Control

Finished goods are inspected to the AQL standard, or 100% inspected when the programme calls for it.

QA - Quality Assurance

Wear, tear and misuse testing, plus a warehouse inspection of the packed goods before delivery.

Raw material testing, PCBA testing and aging testing are carried out at 100 percent. Defective rate can be within 0.3-0.8%.

How quality control is organised

Talk To Someone Who Builds This Product

Send the model, the quantity and the market. You get an answer within 1 hour, and a sample in 1-5 days.

Chat On WhatsApp Email Us
FAQ

Factory FAQ

Can we visit the factory?
Yes. Buyers visit the plant, and we welcome customers to check mass-production goods before delivery.
Do you have your own SMT line?
Yes. Boards are placed on our own SMT line and through-hole parts are wave soldered in house, followed by 100 percent PCBA testing.
What does dust free automatic production line mean here?
Several dust-free automatic production lines were built up as the plant moved from manual to automated assembly, supported by advanced manufacturing technologies and a series of management reforms.
What happens to units that fail inspection?
They are pulled into a segregated rework area rather than passed down the line.

Arrange A Visit Or A Video Walkthrough

If you cannot travel, we will walk the line on a call and show you the station that matters to your product.

Arrange A Visit Email UsQuality And R And D
WhatsAppEmail