Shanghai GNR General Equipment M.F.G +86 21 37788233 · [email protected]

Home / Field handling workflow

Field handling workflow

Skip a step and the next outage is already booked.

  1. Isolate the compartment under the owner’s switching rules.
  2. Connect a sealed recovery path. Check fittings before the valve opens.
  3. Recover into the cart or into a dedicated cylinder.
  4. Confirm residual pressure against the written limit.
  5. Open, repair or inspect.
  6. Evacuate air and moisture.
  7. Refill with recovered or make-up SF6.
  8. Leak-check the joints you touched.

GNR equipment sits on steps 3, 6 and 7. The switching rules stay with the owner.