ONELINK POP CO., LTD — Guangzhou China Tel 86-20-29886323[email protected]
ONELINK POP CO., LTD logo
Solution

Custom Display Development From Brief to Delivery

How a display idea becomes a repeatable production item

Most display projects fail somewhere between the drawing and the second production run. ONELINK POP has an R&D team for display structures and a strict quality control system, so the structure that is approved is the structure that ships again next season.

Process

Step by Step

  1. Brief and Reference

    Send the product dimensions the capacity you need the counter space available and any reference photo or drawing by email.

  2. Structure Selection

    The R&D team reviews the brief against the existing display models so an off-the-shelf structure is used where one already fits.

  3. Material Choice

    Acrylic for permanent counter fixtures printed board for campaign structures wood format for watch presentation.

  4. Artwork Preparation

    Print-ready artwork is prepared against the cutting and folding layout so nothing important falls on a crease.

  5. Sample

    A sample is made before the run so the fit of the product in the display is confirmed on the real item.

  6. Production

    Printing die-cutting folding gluing and assembly run on the in-house equipment.

  7. Quality Control

    The strict quality control system checks the run before packing.

  8. Packing and Delivery

    Displays are packed for transport with flat-pack structures shipped folded.

FAQ

Custom Display Development FAQ

Can we send a drawing instead of a reference photo

Yes. Send a drawing or a photo by email. Either can be used as the starting point for a structure review.

Will you make a sample before the production run

Sampling before a run is the normal way to confirm that the product actually fits the display. Confirm the sample arrangement by email when you request a quotation.

Do you keep the tooling for a repeat order

Ask by email when you place the first order so the repeat arrangement is agreed at the start.

What information do you need to quote

Product dimensions capacity per display quantity material preference and your target date.

Start With the Brief

Product dimensions capacity quantity material preference and target date are enough to begin.