Shenzhen manufacturer · Established 2006 · Contact Gary Lee
Home
About Downloads Contact Request a Quote
Static Transfer Switch

3 Phase Static Transfer Switch

Two independent AC inlets. The load rides on Source A. When A fails, the secondary inlet takes the load without an interruption the connected IT equipment can see. When A returns, the switch can hand the load back.

Nepson 3-phase static transfer switch cabinet

The problem it is built for

A mechanical ATS is fine for lighting and HVAC. It is not fine for a server PSU that browns out in a cycle or two. The HPS range is an SCR static transfer switch: first disconnect, then connect, typical transfer ≤6 ms, efficiency ≥98%.

Published current steps are 63, 100, 160, 250, 300 and 400 A per phase. Input and output are listed as 3-phase AC 380 V ±15%, 50/60 Hz; other voltages can be customized.

Published ratings

ModelsHPS-3363, HPS-33100, HPS-33160, HPS-33250, HPS-33300, HPS-33400
Phases3 phase in / 3 phase out. Transfer number 3P, optional 3P+N
VoltageAC 380 V ±15% (other voltages can be customized)
Frequency50/60 Hz
Max current / phase63 / 100 / 160 / 250 / 300 / 400 A
Transfer time≤6 ms typical
PriorityInput Source-A is priority
Transfer typeSCR / first disconnect then connect
Efficiency≥98%
Connectors / breakerTerminal block. MCB on smaller frames, MCCB on larger frames
DisplayLED working status; LCD voltage, current, power
CoolingAir cooling; AC fan starts on over-temperature
InsulationDC 500 V ≥20 MΩ; withstand AC 1800 V 10 mA / 1 minute
Environment0–45 °C; 0–99% RH non-condensing; altitude ≤1500 m
Cabinets600×600×1000 mm or 600×800×1760 mm (W×D×H)
Net weight65 / 70 / 80 / 105 / 155 / 215 kg across the six models

Figures transcribed from the live product page. Spelling errors on that page are corrected in spelling only.

What we will not invent

The source page does not publish a short-circuit rating, a UL file or a seismic certificate. Those stay TBC until engineering sends the drawing pack.

Questions buyers actually ask

Will this ride through a 10 ms dip?

The published typical transfer is ≤6 ms. Whether a specific PSU rides through that interval is a PSU question. Send the load list with the enquiry.

Can it be 3P+N?

Yes. Transfer number is listed as 3P with 3P+N optional.

Is Source A always preferred?

Yes. The published priority is Input Source-A.