Industrial Plants
Process lines and test benches that need a second source or a foreign-grid waveform.
A plant usually has two problems at once: a feeder that is not as clean as the process needs, and a product that must later run on somebody else’s grid.
The HPS STS covers the first problem when two independent plant sources already exist. The HPA AC source covers the second: 40–499.9 Hz, 0–300 VAC, isolated sine wave, 300% overload.