We reply to enquiries within 12 hours · Mon-Sat 08:30-18:00 GMT+8[email protected]+86 18155106856
Overseas Warehouse

Lovsun All In One ESS 2000W 3000W 4000W 5000W 6000W

2000-6000 W

Lovsun All In One ESS 2000W 3000W 4000W 5000W 6000W is an outdoor all-in-one energy storage cabinet rated at 2000-6000 W. It arrives wired and tested, which removes the rack-by-rack integration work that normally sits on the EPC's critical path.

Key Benefits

What This Product Changes On Your Project

  • Outdoor-rated enclosure removes the cost of a dedicated, ventilated battery room
  • Pre-integrated and factory-tested, so site work is foundation, cabling and commissioning rather than assembly
  • Battery, thermal management, BMS and fire suppression are specified against each other by one supplier
  • Modular capacity - additional units run in parallel as the site load or tariff exposure grows
  • Sized for peak shaving and demand-charge reduction, where the payback is a billing line item rather than a generation estimate

Application Scenarios

  • EV charging hubs buffering the grid draw of simultaneous fast-charge sessions
  • Manufacturing plants shaving monthly demand peaks set by start-up loads
  • Commercial campuses shifting PV output from midday into the evening tariff window
  • Industrial sites bridging short utility interruptions without starting a generator
  • Grid-side projects providing frequency and capacity support

Who It Is For

  • Energy service companies building performance-based storage offers
  • Distributors supplying C&I storage into their own installer network
  • EPC contractors delivering commercial and industrial storage projects
  • Industrial plant engineers managing demand charges and process continuity

Problems It Solves

  • Process interruptions when the utility supply dips or fails
  • Battery-room construction, ventilation and fire compliance that can cost more than the batteries
  • Multi-vendor integration risk when cells, PCS and controls come from three suppliers with three warranties
  • Demand charges set by a handful of peak intervals each month rather than by total consumption

Technical Features

  • Fire detection and suppression designed into the enclosure rather than added by the installer
  • Parallel operation of multiple units under one energy management layer
  • Industrial communication interfaces for SCADA, EMS and remote diagnostics
  • Cells, racks, BMS, thermal management and fire suppression integrated and tested before shipment
  • Multi-level BMS monitoring cell voltage, current and temperature and reporting to the site controller
Specifications

Published Specification Data

These figures come from the manufacturer datasheet for this model. Where a value you need is not listed, ask for the full datasheet rather than assuming a typical figure.

Rated power2000-6000 W
BrandLovsun

Quality Control

  • Full-function test on every finished unit, not a sample from the batch
  • Insulation and dielectric withstand testing on completed assemblies
  • Aged and burn-in run before packing, so early-life failures happen in the factory
  • Serialised traceability from cell batch to finished unit
  • Packing inspection and photo record before container loading

Customization Options

  • Grid code and AC voltage set for the destination market
  • Enclosure colour and customer branding
  • Communication protocol mapped to the site's existing EMS or SCADA
  • Cooling and ingress rating selected for the site climate
Comparison

How It Compares With The Alternatives

A site-built battery roomThe enclosure, thermal system and fire protection ship as one tested assembly, so the site does not have to build, ventilate and certify a room for them.
A diesel generatorStorage responds in milliseconds and has no fuel logistics, but it holds a finite energy budget - most industrial sites end up running both, with storage taking the peaks.
Grid connection upgradeA capacity upgrade is a utility timeline the site does not control. Storage is a capital item the site can schedule itself.
Use Guide

Getting This Product Right On Site

  1. 1

    Confirm grid code, AC voltage and any export limitation required by the utility before production

  2. 2

    Prepare a level foundation, cable routes and a clear service envelope around the enclosure

  3. 3

    Commission with the supplier's sequence and record the baseline before the first billing cycle

  4. 4

    Review the demand-charge line on the first two bills against the model and retune the dispatch schedule

  5. 5

    Send twelve months of interval meter data so the system is sized against the real demand curve, not the connected load

Lovsun All In One ESS 2000W 3000W 4000W 5000W 6000W - Buyer Questions

Do you support commissioning and after-sales on site
We supply the commissioning sequence and remote support as standard. On-site commissioning is arranged per project - confirm the scope you need when you enquire.
What is the minimum order quantity
One unit. Project pricing improves with quantity and with a scheduled delivery plan.
What is the lead time on this system
Lead time depends on configuration and the destination grid code. Send the site load profile and required grid standard and we will confirm a production and shipping schedule with the quotation.
Can the system be sized for our specific load profile
Yes. Capacity and power rating are configured per project. Twelve months of interval meter data gives the most accurate sizing; a monthly bill history is workable if interval data is not available.
What certification does the system carry
Certification depends on configuration and destination market. We confirm the applicable approvals in writing for each project before production - ask for the certificate pack with your quotation.
How is the system shipped and what does the site need to prepare
The unit ships as a pre-integrated enclosure. The site needs a level foundation, cable routes, a clear service envelope and grid connection approval before commissioning.

Request A Quote For Lovsun All In One ESS 2000W 3000W 4000W 5000W 6000W

Tell us the quantity, the destination market and the application. We reply within 12 hours with lead time, certification and pricing.