Commissioning Checklist For Commercial Solar and Storage

The checks that separate a system that works on the day from one that is still being argued about three months later.

Before energising

Verify string voltages against the inverter MPPT window at the site's record low temperature, confirm polarity on every string, check terminal torque against the manual and confirm the grid code setting matches the destination market.

Battery and communication

Confirm the battery firmware version and the inverter handshake over CAN or RS485. Check that state of charge reported by the battery and by the inverter agree before anybody leaves the site.

Protection and transfer

Test anti-islanding, residual-current monitoring and - where backup is part of the scope - the transfer to island mode with the actual critical loads connected, not with a test load.

Monitoring and baseline

Commission the monitoring interface on the same visit rather than as a follow-up trip, and record the baseline configuration and firmware versions. This record is what any later performance question is measured against.

Handover

Walk the site team through the control logic, the dispatch schedule and what normal looks like on the monitoring screen. A system nobody on site understands becomes a maintenance liability.

Questions About This Guide

Can you advise on our specific project
Yes. General guidance only goes so far - send the site details and load profile and we will answer against your numbers instead of typical ones.
Where can I get the datasheet for the products mentioned here
Message or email us with the model name. We send the current datasheet directly rather than publishing files that go stale between revisions.
Do you ship to our country
Lovsun products have been delivered to over 150 countries. Tell us the destination and we will confirm shipping route, documentation and the applicable grid standard.

Apply This To Your Own Project

Send the site details, the load profile and the destination market. Our engineers will answer against your numbers rather than typical ones.