How To Specify A Production Line For A Factory You Have Not Built Yet
Buying Guide

How To Specify A Production Line For A Factory You Have Not Built Yet

Most first time plant investors start by asking for an equipment price. The more useful starting point is the output you have to hold, the building you have and the crew you can keep.

Start From Output Per Shift

Zino matches customer resources against the output target with suitable optimisation. Delivered projects range from 50 units per shift to 600, and the configuration follows from that number.

Start From Output Per Shift

Bring The Building Into The Conversation Early

Line layouts are customised according to the user request. The Jordan project is the reminder that site dimensions matter down to the centimetre.

Bring The Building Into The Conversation Early

Decide The Standard Before The Design

The default design standard is the latest GB standard. Supplying your own national standard in advance means it is applied right from the start.

Ask Who Will Be There At Trial Production

A Zino turnkey scope includes site instruction, debugging, trial production, training and mass production support, with a 24 hour response guideline afterwards. Compare that scope, not only the machine list.

Ask Who Will Be There At Trial Production

Related Servicing

Plan The Material Supply Too

Rebar production runs 30 days or less. Ordering the bar with the line keeps the first castings on schedule.

Plan The Material Supply Too

Reinforced Steel Bar

FAQ

Reader Questions

What information do you need to propose a line?
The output per shift you must reach, the product sections, the building dimensions and the standard you work to.
Do you deliver outside pole and pile?
Yes. Bolt lines, EPS sandwich panel lines and a PE bottle making and filling line have all been delivered as turnkey projects.

Related Products

Related Projects

Fastener and Power Fitting Manufacturers · Prefabricated Steel Building Makers · Turnkey Production Line Delivery · Standards And Downloads

Apply This To Your Own Plant

Send your product sections and output target and the team will answer against your own figures.