Decorative LED lighting manufacturer in Zhongshan China since 2016 [email protected]+86 138 2394 0732
Spiral chandelier in a stair void seen from the ground floor
Case Study

Chandelier Project in France

The fixture had to be read from the ground floor, from the stair itself and from the landing above, which rules out anything flat.

Client Background

The Project

A French interior project specifying a sculptural chandelier for a stair void.

Project Challenge

What Made It Difficult

The fixture had to be read from the ground floor, from the stair itself and from the landing above, which rules out anything flat.

Customer Pain Points

What The Buyer Was Worried About

  • Single plane fixtures look thin when seen from a landing
  • Void height was confirmed late in the programme
  • One ceiling fixing point was available
Our Solution

What We Supplied

A spiralling chandelier hung on a single suspension, so the form has depth from every level and only one structural fixing was needed.

  1. Void height and fixing point confirmed

  2. Suspension length set to the measured drop

  3. Finish sprayed in one batch

  4. Piece packed singly and drop tested

Supply Chain Coordination

Getting It To Site

Shipped as one consignment with the suspension pre-set to the measured drop, so the site installed without cutting cable.

Quality Control

What We Checked

Assembly and finish checked before packing, with the carton verified by drop test.

Final Result

How It Ended

The chandelier was installed from a single ceiling point and reads as one continuous form from all three levels.

Customer Benefit

What The Buyer Gained

No secondary steelwork and no on-site cable cutting.

Questions Buyers Ask

Questions About This Project

Can you supply a project of this type again?

Yes. This is normal project work for us and runs through our residential interiors process.

What do you need to quote a project like this?

A fixture schedule with quantities, finishes and colour temperatures, plus measured ceiling heights if drops are to be cut at the factory.

How long would production take?

20 days or less on the models in this catalogue. Transit is quoted separately and depends on the shipping mode.

Is the client named?

No. We describe projects by type and destination rather than naming clients, unless the client has asked us to.

Have A Similar Project

Send the fixture schedule or a photograph of the space and we tell you which models fit and what it costs.