Sampling To Bulk Production
The route from an approved sample to a shipped production run without the usual surprises.
Sampling To Bulk Production
Most complaints in this trade come from the gap between the sample a buyer approved and the cartons that arrive. This is how we keep that gap closed.
Every Step And The Problem It Removes
Sample approval
Approval is given verbally and later disputed. The approved pair and its specification are recorded as the reference for the order.
Material confirmation
Leather batches vary between sample and bulk. Materials are confirmed against the approved sample before bulk cutting starts.
Line set-up
A new style needs the line adjusted before volume begins. The approved pair is used to set up the line and check the first output against it.
In-line checking
Faults found only at the end mean rework of the whole run. Checking happens through the run, not only at the end of it.
Packing
Marking and carton details arrive after the goods are boxed. Packing, marking and carton details are confirmed before packing begins.
Shipment
Several suppliers mean several shipments. Footwear and accessories from this factory ship together.
Lines We Run This Way
Questions About Sampling To Bulk Production
How long is the sample stage?
Sample delivery is normally 30 days once design and materials are confirmed.
Can we inspect before shipment?
Yes. Tell us your inspection arrangement when the order is placed and we will schedule the run around it.
Run Your Next Programme This Way
Send your design or your brief. We will confirm the stages, the materials and a sample date before anything is cut.