Skip to content
Qingdao Sinoland Medical Co., Ltd. · Qingdao, China
Distributor and Private Label Sourcing

Distributor and Private Label Sourcing

Building an own-brand medical or personal care range fails in two places: the compliance file for the destination market, and the gap between the sample and the second production run. Both are handled before production, not after.

Stage by stage

Where Orders Go Wrong And What We Do About It

Each stage below is a place buyers tell us an order has failed before. The second line is what we change.

01

Market and compliance check

Problem. A product that sells well in one market cannot be listed in another because of peroxide rules, device classification or missing regional files.

How we handle it. The destination market is confirmed first, then the product variant and certification file set that can actually be listed there.

02

Sample and trial order

Problem. Committing to an OEM run before the market is tested ties up capital in stock that may not move.

How we handle it. Where stock allows, a small order ships in 1 to 3 days so the listing can be tested before OEM production is committed.

03

Artwork and private label

Problem. Artwork approved by email and changed verbally produces a print run that has to be scrapped.

How we handle it. Packaging, manual and label artwork are approved in writing before production, and the approved files are held for repeat runs.

04

Production

Problem. A second run that differs from the first generates customer complaints the distributor has to absorb.

How we handle it. Specification, artwork and packing format are held on file so repeat runs match the shipment your customers already received.

05

Packing and loading

Problem. Container space is wasted because carton dimensions were never planned against the pallet pattern.

How we handle it. Carton counts, palletising and the loading plan are confirmed before production.

06

Documents and shipment

Problem. Goods arrive before the certification files, and the shipment sits at the port.

How we handle it. Certification documents are sent by email before shipment so your broker has them in advance.

FAQ

Distributor and Private Label Sourcing Questions

What is the lead time for a private label order

On several lines a stock order ships in 1 to 3 days, and OEM production takes 12 to 20 days once artwork is approved.

Which certification files can you provide

CE, FDA, RoHS, REACH, CPSR, MSDS and factory GMP or ISO 22716 across different product lines. Send the destination market and product and we will confirm which apply.

Can we change the formulation for our market

On the whitening kit, PAP, non-peroxide and peroxide gels are available so the product can be listed where peroxide is restricted.

What do you need to start an artwork proof

Your logo files, the destination market and the language for the manual and label. We return a proof for written approval before production.

Do you keep our artwork on file for repeat orders

Yes. Approved artwork and packing format are held so a repeat run matches the first.

Start With Your Requirement List

Send the list, the destination market and the delivery window. We come back with stock status, lead time, documentation and a loading plan.