ISO 9001 & BSCI factory · OEM/ODM · 25+ years
Wholesale and Import Programs - Newin Best EVA foam mats

Wholesale and Import Programs

A wholesale programme lives or dies on whether the second order matches the first and whether the container leaves when the factory said it would.

Process

Every Stage From Brief To Container

Each stage below is a decision point where a specification can still be changed without repeating the one before it.

Step 01

Specification

Style, size, thickness, density and colour fixed in writing before quoting, so later batches have a reference.

Step 02

Quotation

Priced on material, density and pack format rather than a headline rate.

Step 03

Sample approval

The approved sample is retained by both sides as the production standard.

Step 04

Production

Regular orders run inside a 30-day lead time.

Step 05

Inspection

Third-party inspection at 80% production on request — we work with SGS, TÜV, Bureau Veritas and QIMA.

Step 06

Shipping

Loading from Shuyang for Shanghai or Qingdao departure, up to 150×40'HQ containers a month.

Products in this route

Lines Commonly Ordered This Way

Gym Mats - interlocking EVA foam floor tileLeaf Pattern

Gym Mats

Gym Mats come in a variety of vibrant colors, including popular options like black, gray, and blue.

Specifications
Puzzle Baby Play EVA Foam Mat - interlocking EVA foam floor tilePuzzle Baby Play Mats

Puzzle Baby Play EVA Foam Mat

Our puzzle EVA foam mat features colorful and engaging designs, including letters, numbers, cartoons, and toy patterns.

Specifications
Tatami Mats - interlocking EVA foam floor tileTatami

Tatami Mats

A tatami EVA foam mat is a type of floor mat commonly used in martial arts, yoga, and other fitness activities.

Specifications
Inside the plant

Where This Actually Happens

Compounding, foaming, lamination, die-cutting, inspection and loading all run on one 18,000 m² site with 120+ production workers.

Factory and exhibitions
Newin Best EVA foam mat factory buildings and workshops
Related guides

The Detail Behind This Process

Wholesale EVA Foam Mats from China: MOQ, Pricing and Shipping Explained
2026-07-19

Wholesale EVA Foam Mats from China: MOQ, Pricing and Shipping Explained

A practical wholesale sourcing guide for EVA foam mats from China: how factories quote, what drives price, MOQ norms, FOB vs DDP s

Read the guide
EVA Tile Sizes Explained: 30×30, 60×60 and 1×1 m Formats and the Coverage Math
2026-08-24

EVA Tile Sizes Explained: 30×30, 60×60 and 1×1 m Formats and the Coverage Math

EVA foam tile sizes compared: 30×30 cm, 60×60 cm and 1×1 m formats — packaging, shipping volume, installation speed and how to cal

Read the guide
EVA Foam Mat Certifications Explained: EN71, REACH, GRS, BSCI and ISO
2026-07-05

EVA Foam Mat Certifications Explained: EN71, REACH, GRS, BSCI and ISO

What EN71, REACH, SGS, GRS, BSCI and ISO 9001 actually certify on an EVA foam mat — and which certificates your market and channel

Read the guide
FAQ

Wholesale and Import Programs FAQ

How long does this process take?

Sampling normally runs in days rather than weeks, and regular production orders are delivered within 30 days once the sample is approved.

Do I pay for samples?

Samples are sent by express with freight collect, and the courier charge is refunded on your first bulk order.

Can you work to our existing specification sheet?

Yes. Send the density, thickness, size, surface and certification requirement and we will quote against it directly.

What payment terms do you accept?

T/T, L/C, D/P and O/A, with 24/7 after-sales support and a 2-year product warranty.

Start With A Sample

Send us the specification and we will send a physical sample before anything is committed to production.