ISO 9001 & BSCI factory · OEM/ODM · 25+ years
Factory and Exhibitions - Newin Best EVA foam mats

Factory and Exhibitions

A stable and complete production and quality management system is the foundation for everything we ship — here is the floor it runs on.

Inside our factory

Where EVA Foam Mats Are Made

Production workshop at the Newin Best EVA foam mat factory

Production workshop

Foaming and cutting lines run inside the 18,000 m² Suqian plant, which keeps density and tile dimensions under one quality system.

Raw material and finished goods at the Newin Best EVA foam mat factory

Raw material and finished goods

Material storage and finished-goods areas sit on the same site, so an approved compound and a packed order never move between subcontractors.

Moulding and pressing at the Newin Best EVA foam mat factory

Moulding and pressing

Sheets are expanded under heat and pressure — the stage that decides whether a mat still measures its stated thickness after a season of use.

Inspection and loading at the Newin Best EVA foam mat factory

Inspection and loading

Final sampling before every shipment, with loading photographs available on request and third-party inspection arranged at 80% production.

360° tour

Walk The Workshop Floor

Drag to explore the production workshops, raw-material warehouse and finished-goods area. It is the same floor your order is produced on.

Newin Best EVA foam mat factory buildings and workshops
Production process

From EVA Resin To A Packed Container

01

Compounding

EVA resin, LDPE and colour masterbatch are weighed and mixed to the density the order specifies — 70–75 kg/m³ for standard tiles, 80 kg/m³ for rubber-blend and tatami.

02

Foaming

Sheets are moulded and expanded under heat and pressure. Cell structure at this stage decides whether the mat keeps its thickness under load.

03

Lamination

Printed film, suede or rubber surfaces are bonded for wood-grain, plush and heavy-duty lines.

04

Die-Cutting

Tiles and interlocking edges are cut to 30×30, 50×50, 60×60 or 100×100 cm, or to your own tooling.

05

Inspection

Incoming material checks, in-process inspection and final sampling before every shipment, with third-party testing arranged on request.

06

Packing & Loading

Shrink-wrapped inner with carton outer, loaded from Shuyang for Shanghai or Qingdao departure.

Newin Best EVA foam mat production process chart
The production and quality management flow published by the factory.
Exhibitions

Meeting Buyers Face To Face

Exhibitions are where sample specifications get agreed in one conversation instead of ten emails. At the 133rd Canton Fair our booth was 14.2G09 in Phase 2.

Toy expo stand at the Newin Best EVA foam mat factory

Toy expo stand

Our toy-industry stand, where puzzle play mats are shown to retail and distribution buyers.

EVA foam mat exhibition at the Newin Best EVA foam mat factory

EVA foam mat exhibition

Full product range on display — solid colour, tatami, pool grid and printed film lines side by side.

Meeting buyers face to face at the Newin Best EVA foam mat factory

Meeting buyers face to face

Exhibitions are where sample specifications get agreed in one conversation instead of ten emails.

FAQ

Factory FAQ

How large is the factory?

18,000 m² in Suqian, Jiangsu, with raw-material storage, foaming lines, lamination, cutting, printing and packaging workshops on one site.

How many people work in production?

More than 120 experienced production workers, alongside automated foaming and cutting lines.

Can I see the production line before ordering?

Yes — a 360° virtual tour of the workshops is on this page, and buyers are welcome to visit or send a third-party inspector.

Where do you exhibit?

We exhibit at the Canton Fair and toy industry expos. At the 133rd Canton Fair our booth was 14.2G09 in Phase 2.

Book A Visit Or An Inspection

Come to Shuyang, or send SGS, TÜV, Bureau Veritas or QIMA on your behalf.