Since 2013, focused on high quality automotive lighting
From Model List to Container at Dantech

From Model List to Container

How a Dantech order runs from first model list through to a loaded container.

The Process

Four Stages From First Question to Delivered Goods

Each stage lists the problem it exists to prevent, then what happens in practice.

  1. Model Selection

    A list of wattages is not enough to quote against.

    Send the machine, the mounting position and the voltage system. We come back with the model numbers from the range that actually fit, with the spec sheet for each.

  2. Sampling

    Photographs do not tell you how a lamp behaves on a vibrating machine.

    Samples go out before volume so the beam, the bracket and the connector can be checked on the real machine.

  3. Production

    Mixed orders across several categories are where lead times slip.

    Production is scheduled across the whole order so the container ships complete rather than in parts, normally in 30 to 40 days.

  4. Shipping and After Sales

    The relationship does not end at the bill of lading.

    Products carry a two year warranty. Replacement parts for a claim are consolidated into the next shipment where the timing allows.

Questions About This Route

What information do you need to start?
The mounting position, the system voltage, the beam pattern or working distance, any approval that is a condition of the order, and the annual quantity. Those five lines are enough to quote.
How long does a production order take?
The stated lead time is about 30 to 40 days, with samples normally available sooner.
Is there a warranty on production orders?
The stated warranty period is two years.

Start a From Model List to Container Conversation

A short description of the machine, the quantity and the market is enough to get a useful first answer back.