OEM and Private Label Programmes
Take an existing Dantech housing and put your brand, your connector and your packaging on it.
Four Stages From First Question to Delivered Goods
Each stage lists the problem it exists to prevent, then what happens in practice.
Requirement Review
A private label programme usually starts from a target price and a fitment, not a drawing.
We work back from the mounting position, the voltage system and the approval you need, and shortlist housings from the existing range before anything is tooled.
Sample Build
Committing to a container before anyone has held the lamp is where private label programmes go wrong.
Samples are built from the production tooling so what you test is what you receive. Lens finish, bracket and connector are fixed at this point.
Branding and Packaging
Marking and packaging are usually the last thing agreed and the first thing that delays shipment.
Housing marking, lens marking, label artwork and carton print are confirmed in writing before the production run is scheduled.
Production and Delivery
Lead time has to be predictable enough to plan a container around.
Production runs to the agreed specification with lead time of about 30 to 40 days, and products carry a two year warranty.
Products Most Often Involved

7 Inch 160W New Design for Special Vehicles,Trucks,Construction Vehicles,50G Shock Resistance R10 IP68
160W · 12,800 lm · IP68
View specification →
6 Inch 120W New Design for Special Vehicles,Trucks,Construction Vehicles,50G Shock Resistance R10 IP68
120W · 9,600 lm · IP68
View specification →
Single row 10W led light bar
30W · IP68
View specification →
Single row led light bar
9W · IP68
View specification →Background Guides
Raw Lumens and Effective Lumens on a Work Lamp Spec Sheet
Two lumen figures on the same lamp are not a marketing trick. They describe different things and only one of them reaches your work area.
Read the guide →What IP67 and IP68 Actually Cover on a Vehicle Lamp
The ingress protection rating tells you about dust and immersion. It does not tell you about pressure washing, salt or thermal shock.
Read the guide →Flood Spot and Combination Beam Patterns Compared
Choosing the beam pattern before the wattage saves more complaints than any other decision in a lighting order.
Read the guide →Questions About This Route
What information do you need to start?
How long does a production order take?
Is there a warranty on production orders?
Start a OEM and Private Label Programmes Conversation
A short description of the machine, the quantity and the market is enough to get a useful first answer back.