Custom metal and soft PVC promotional gifts · Changsha, China
Antique brass challenge coins with struck insignia
Industry

Sports Events and Schools

A race or a sports day has one date. The medal has to be approved, produced, plated, ribboned and shipped against that date, and the artwork usually arrives late.

Antique brass challenge coins with struck insignia
Pain Points

What Goes Wrong in This Sector

Artwork is signed off only weeks before the event.

Participant numbers move after the order is placed.

Ribbon colours and medal finishes are quoted by separate suppliers.

How We Answer It

Medals delivered before the finish line

  • Free artwork redrawing, then samples in 3-5 days and bulk production in 10-15 days.
  • No fixed minimum order quantity, so a top-up run is possible when entries rise.
  • Medal and lanyard supplied together against one approved sample.

Delivery Capability

3-5 days

Free sample

10-15 days

Bulk production

None

Fixed minimum order

within 2 hours

Quotation reply

Product Families

Categories That Suit This Sector

Recommended Products

A Starting Specification

These are the items most often specified by buyers in this sector. Each one is produced to your own artwork.

Typical Scenarios

How the Brief Usually Arrives

Road race

3D sport medal with a printed lanyard, packed by distance category.

School sports day

Die-stamped iron medals in gold, silver and bronze finishes.

Club anniversary

A cast trophy and a matching challenge coin from the same artwork.

Process

From Enquiry to Delivery

Brief and Artwork

Send the logo, sketch or sample. Artwork is redrawn for production at no charge.

Free Sample

A physical sample in 3-5 days so colour and fitting are approved in the hand.

Production

Bulk in 10-15 days, matched back to the approved sample.

Packing and Shipment

100 to 1000 pieces per bag or box, or packed to your specification, then shipped to your forwarder or door.

Case Studies

Projects in This Sector

FAQ

Questions From Sports Events and Schools

Do you work with sports events and schools?

Free artwork redrawing, then samples in 3-5 days and bulk production in 10-15 days.

Can you handle several product lines in one order?

Yes. Metal and soft PVC lines are made in the same plant, so a mixed order is proofed and shipped together.

What is the minimum order quantity?

There is no fixed minimum order quantity.

How long does production take?

A free sample in 3-5 days and bulk production in 10-15 days.

Do you charge for the design work?

No. Artwork is redrawn for production free of charge and the first sample is free.

How are the goods packed?

Normally 100 to 1000 pieces in one PP bag or small box. Special packing is accepted.

Get a Quote for Your Sector

Tell us the item, the quantity and the date. You will have a reply in around two hours during working hours.