Pool cues, snooker cues, balls, chalk, tips and cases, made in Taishan since the early 1990s Mon-Fri 9:00-17:00, Sat-Sun 10:00-18:00 (GMT+8) [email protected] +86 188 2648 6834
  1. Home
  2. Products
  3. Consumables Supply Programme
Billiard manufacturer direct sale in stock American 1/2 split cue 13MM large tip cue
Programme

Consumables Supply Programme

Chalk, tips and gloves on a repeating schedule, ordered against the same published product page every time.

Consumables are where a room's equipment budget actually goes, and where specification drift does the most damage: this season's chalk is not last season's, and nobody can say why the miscue rate went up. A repeating order against a fixed product page solves it.

Stage By Stage

Consumables Supply Programme In 5 Steps

Establish the baseline

Rooms rarely know which chalk or tip they are actually using.

Identify the exact product page for the chalk grade, the tip diameter and the glove style currently in use, and order against that page from then on.

Set the pack sizes

Retail packs bought at bulk scale waste money on packaging.

Chalk runs from single wrapped pieces to 100-piece boxes and tips come in 50-piece packs, so the pack size can match the consumption.

Trial before switching

Switching chalk grade across a room mid-season changes how every table plays at once.

A sample order of the alternative grade goes to one or two tables before the room changes over.

Fix the reorder cycle

Consumables get reordered when they run out, which is always the worst moment.

Agree a cycle against your own usage so the reorder is placed before the room is out, and quote it against the same page each time.

Keep quality visible

A bad batch is only obvious after it is in play.

Full QC before shipment, with the source's stated refund or replacement on quality faults, and photographs of any fault sent back from the room.

Questions

Consumables Supply Programme Questions

Can we get the same chalk grade every time?
Yes, by ordering against the product page rather than by description. The grade codes published on those pages are what makes a repeat order specific.
Is a standing order possible?
Scheduling is a commercial arrangement rather than a published service, so agree the cycle by email. What is published here is the pack size to build it on.
What if our usage changes seasonally?
Order against the pack sizes rather than a fixed annual quantity. Chalk in particular is published across a wide range of box quantities for that reason.
Do gloves belong in a consumables cycle?
In busy or humid rooms, yes: the bridge area wears first. The glove pages publish the fabric and closure so replacements match what players are used to.

Start On Consumables Supply Programme

Send the items, the quantity and the destination country. A recommended starting point with the matching figures comes back by email.