Since 2011, We Focus on Thermostats [email protected]+8618820035458
  1. Home
  2. Solutions
  3. Sampling and Small Batch Testing
Smart Therm thermostat production
Solution

Sampling and Small Batch Testing

Before a range is committed, the product has to survive a real installation.

Process

Every Stage, And What Usually Goes Wrong At It

Specification

Problem: A sample ordered that turns out to be the wrong staging.

We confirm staging, voltage, terminal set and mounting standard against your equipment before the sample is built.

Sample build

Problem: Samples taking months.

Samples are delivered within 30 days, built on the same line as production.

Field trial

Problem: One sample proving nothing about a batch.

We supply small batch testing quantities so a real installation can be trialled before commitment.

Feedback and revision

Problem: Change requests lost between sales and the factory.

R&D, electrical and production teams are in the same factory, so revisions go straight into the next sample.

Production release

Problem: The trial product differing from what ships.

The approved sample becomes the reference for production, with bulk delivery in 15 to 45 days.

Answers

Sampling and Small Batch Testing: Common Questions

Are you a factory or a trading company?

A manufacturer. We have our own production plant in Dongguan, Guangdong, with R&D, electrical, quality, production and marketing teams on site.

Can we visit the factory?

Yes, of course. You can visit our factory at any time.

Do you have an e-catalogue?

Yes. Tell us where to send it and the catalogue goes out the same day, or download the PDF from our downloads page.

How do we start?

Message us on WhatsApp or email with the model, the quantity and the destination market, and we will come back with a quotation and a lead time.

Start A Sampling and Small Batch Testing Project

Send us the requirement and the volume. We will tell you what needs tooling, what does not, and what it costs.