Senko Presentation Board — branch factory of Senko Industry
Push pull classroom board system with mixed chalk and whiteboard panels

Classroom Board Fit Out

From a room schedule to boards on the wall, this is how a school or university board package is specified built and shipped.

Stage By Stage

Where Projects Go Wrong and How We Handle It

Each stage lists the problem first and what we do about it second.

  1. Requirement

    Room schedule, wall widths and projector positions are unknown at quotation stage and drive every later decision.

    Send the room list with wall dimensions. We come back with a board system per room type rather than one board repeated everywhere.

  2. Board System

    A single fixed board runs out of writing space, and a projector on the same wall makes it worse.

    Rise and fall for tall walls, push pull where a projector shares the wall, folded boards where the wall is short.

  3. Surface

    Resin coated surfaces wear faster in rooms taught in all day.

    Ceramic coated green or white writing steel for heavy use rooms, resin coated elsewhere, both from our own coil line.

  4. Sizing

    Board runs longer than three metres cannot be made as one panel.

    Under three metres we build one board. Over three metres we build two boards that work together across the wall.

  5. Build

    Frame quality decides whether a board still sits square after a few years.

    Aluminium frames and ABS corners are produced here and fitted to boards laminated in the same works.

  6. Shipping

    Board packages are bulky and expensive to ship badly.

    Boards are packed and loaded by room so a 40'HQ container arrives ready to distribute. Around 30 days for one container.

Questions

Classroom Board Fit Out Questions

How do you handle a wall longer than three metres?

Two chalkboards are built to work together across the wall.

Can panels differ within one board?

Yes, on the push pull system each panel is specified separately as chalk, glossy whiteboard or matt projection.

What is the lead time for a school package?

Around 30 days for one 40'HQ container.