Completed CONSIDER hard-shell hyperbaric chamber ready for shipment

Freight, payment, customs and commissioning

Worldwide Delivery and Import Support

The equipment decision is usually settled quickly. What slows a project down is freight mode, payment terms, packed dimensions and who is responsible at the destination port.

Stage by stage

Where Projects Go Wrong and How We Handle It

Each stage lists the failure we see most often, then what happens instead when the step is handled properly.

  1. Quotation

    Quotations that list a chamber price only hide half the landed cost.

    The quotation identifies the main unit, standard supporting equipment, accessories, documentation and any optional items for the selected model.

  2. Payment terms

    Unclear terms stall orders at the bank rather than at the factory.

    Bank transfer (T/T) with a formal Proforma Invoice issued on order confirmation and full payment before shipment. Custom terms are available for large or distributor orders.

  3. Production and testing

    A ship date guessed at the start rarely survives configuration changes.

    Lead time of 10-30 days after testing is confirmed against the final model and configuration, and every machine completes tune-up testing before packing.

  4. Freight mode

    Air freight on a 1200 kg chamber costs more than the margin on the order.

    Air freight at 7-10 days suits soft chambers and urgent orders; sea freight at 4-6 weeks suits hard-shell systems and multi-unit shipments. Packed dimensions are confirmed in advance.

  5. Customs and unloading

    Nobody planned who unloads a crated pressure vessel.

    Customs responsibilities, packed dimensions and unloading requirements are agreed before shipment so the destination team is ready.

  6. Commissioning

    Equipment that sits crated is not equipment.

    Remote installation, operation guidance, troubleshooting and lifetime online technical support begin as soon as the shipment lands.

Fixed commitments

What Does Not Change

  • Minimum order quantity of one unit
  • Production 10-30 days after testing
  • Air freight 7-10 days, sea freight 4-6 weeks
  • Bank transfer with Proforma Invoice on confirmation
  • 1-year warranty on non-consumable parts
  • Lifetime online technical support
Email The Team

Models most often involved

Equipment Behind This Programme

COSL15 Soft Lying Hyperbaric Chamber
COSL15

Soft Lying Hyperbaric Chamber

1.5 ATA portable soft lying chamber for recovery studios, distributors and home channels seeking a spacious everyday-use format.

1.5 ATAFrom US$3,000+
COHB20 Multiplace Hard Shell — 1 to 5 Users
COHB20

Multiplace Hard Shell — 1 to 5 Users

1.2-2.0 ATA stainless-steel multiplace system for one to five users and clinics planning higher daily session capacity.

1.2–2.0 ATAFrom US$40,000+
COST20 Professional 2.0 ATA Sitting Chamber
COST20

Professional 2.0 ATA Sitting Chamber

Professional 2.0 ATA portable sitting chamber for clinics, recovery studios and buyers requiring an upright high-pressure soft system.

Up to 2.0 ATA
COPB15 Veterinary Chamber — Large Animals
COPB15

Veterinary Chamber — Large Animals

1.5 ATA stainless-steel cylindrical veterinary chamber for large-animal clinics, equine care and specialist distribution channels.

Up to 1.5 ATA

Case studies

Programmes That Ran This Way

Related guides

Detail Behind Each Stage

Business · 3 min read

OEM & ODM Hyperbaric Chamber Sourcing

Plan an OEM/ODM chamber line by market, models, customization, documentation, sample approval, order terms, freight and after-sales support.

Read the guide

Frequently asked questions

Questions About This Programme

How long does delivery take?

Air freight typically takes 7-10 days and sea freight 4-6 weeks, depending on destination. Production of 10-30 days after testing comes before that.

What payment methods are accepted?

Bank transfer (T/T), with a formal Proforma Invoice issued on order confirmation and full payment required before shipment. Custom terms can be discussed for large or distributor orders.

Are the chambers packed for international freight?

Yes. All products are securely packaged and ready for installation on arrival. Packed dimensions are confirmed before shipment so unloading and storage can be planned.

Who handles customs clearance?

Customs responsibilities are agreed with the quotation and depend on the incoterms for your order. Confirm them before production so the destination clearance agent has what it needs.

Direct manufacturer inquiry

Start With a Scope Rather Than a Price List

Tell us the market, the models you are considering and the volume you expect. We will map the stages against your timeline and quote against the scope.

+86 189 5204 6936[email protected]Model recommendation within 12 hours