Sample And Pre-production Approval Before Anything Runs In Volume

The documented qualification flow from our own quality page: first article inspection capability study pre-production run PPAP and ECN release.

Shower Head Series produced by NingBo CM Industry Ltd.

Our quality page sets out what happens before a new part is released to production, and it is more specific than most factories publish: first article inspection, process capability study, pre-production runs to produce a limited number of samples, production part approval process, and ECN release to production after customer approval.

Not every order needs all five. Which ones apply depends on customer requirements, engineering complexity and quality constraints, in our own published wording. This page is here so you can decide which of them your programme should ask for.

Step By Step

How This Solution Runs

  1. Incoming Material Inspection

    All purchased products that go into a CM final product are subject to a technical quality control inspection, with material certifications kept on file for incoming thermoplastic resin shipments.

  2. First Article Inspection

    The first parts off the tool measured against the drawing before anything else happens.

  3. Process Capability Study

    Run where the tolerance and the volume justify it.

  4. Pre-production Run

    A limited number of samples produced under production conditions.

  5. PPAP

    Production part approval process where your programme requires it.

  6. ECN Release

    Release to production after your approval.

What We Deliver

  • Documented incoming material inspection with resin certifications on file.
  • A qualification path scaled to the part rather than a single fixed procedure.
  • Dimensional functional and destructive verification through the production cycle.
  • Third party inspection lab measurement including CMM and optical comparator equipment.

Where The Work Happens

Mould making plastic injection electricity plating mould maintenance testing and quality control and assembling and packing are all in-house operations at our Ningbo plant.

Mould MakingOwn molding centre
Plastic InjectionComputer controlled
Electricity PlatingIn-house line
AssemblingOwn benches
Testing And QCDocumented flow
Blister And BoxOwn machines
Export CartonNingbo port
Product Fit

Series This Solution Applies To

Shower Head Series from NingBo CM Industry Ltd.
Shower Series

Shower Head Series

83 hand shower and shower head models in ABS with chrome plating produced from our own moulds on computer controlled injection machines.

83 models  ·  See The Range
Steering Wheel from NingBo CM Industry Ltd.
Accessories

Steering Wheel

Ten steering wheel models produced on the same injection and finishing lines as our sanitary ware, each quoted against the car make it is built for.

10 models  ·  See The Range
Electric Bidet from NingBo CM Industry Ltd.
Bidet Series

Electric Bidet

Three electric bidet seat models: ZJ 68A all in one ZJ 58A and ZJ 28A with the full function list published on each product page.

3 models  ·  See The Range
Bathroom Rack from NingBo CM Industry Ltd.
Kitchen And Toilet

Bathroom Rack

Four finished rack models CMF010 to CMF013 built on the Easy Stick mount: no tooling no magnet no tape no glue and re-usable.

4 models  ·  See The Range
Knowledge

Background Reading

FAQ

Questions About Sample And Pre-production Approval

First article inspection, process capability study, a pre-production run, PPAP and ECN release after your approval. Which of those apply depends on your requirements and the complexity of the part.

Our inspection lab is third party and features a Brown and Sharp Microval coordinate measuring machine with Quadra-Check 3D software, an OGP optical comparator with smart edge detection, and standard calipers micrometers thread and height gauges and surface plates.

Material certifications are kept on file for all incoming shipments of thermoplastic resins.

Through internal audits, trend monitoring on corrective and preventive action requests, analysis of product conformity data, and periodic customer satisfaction surveys.