RUIAN CHINO AUTO ELECTRIC FACTORY · 14 Years of Experience
CHINO ELECTRIC Request A Quote
Relay housings and mounting brackets bagged individually before boxing
Solution

Quality Assurance and Testing

What is actually tested, what it is tested with, and what happens when a part fails in the field.

An electrical part that fails puts a truck on the hard shoulder, so a buyer is entitled to ask exactly what was checked before the box was sealed. CHINO ELECTRIC operates to IATF 16949:2016 documented process control, with product pages also carrying ISO 9001:2015. Every step below is something we do rather than something we intend to do.

Step by Step

Every Stage and What It Fixes

Incoming Material

Problem: A component that fails in service usually fails because of what went into it.

How we solve it: Component materials come from named suppliers: Alstrom Korea, Hollingsworth and Vose USA, Gessner Germany, AB glue from Taiwan and steel from BAO Steel Shanghai.

Documented Process Control

Problem: Quality that depends on which operator was on shift.

How we solve it: Operation and QC documents fix the process requirements, parameters and control points for every production step, and they are performed strictly rather than filed.

In Process Checks

Problem: Faults found only at final inspection, after all the value has been added.

How we solve it: Key quality control points are defined in each process step so a deviation is caught where it happens.

Leakage Test

Problem: Moisture ingress is the most common cause of field failure on vehicle electrical parts.

How we solve it: A leakage test is performed on 100 percent of spare parts before delivery. Not a sample, every unit.

Laboratory Testing

Problem: Performance claims nobody has measured.

How we solve it: Performance parameters are tested in our own laboratory rather than being taken from a component datasheet.

Recorded Evidence

Problem: A buyer overseas cannot walk the line.

How we solve it: Video has been made of every process and of the tests, and published on YouTube so you can see the procedure before you place an order.

Warranty and Response

Problem: A failure in the field with no route back to the factory.

How we solve it: 12 months from B/L date. We respond within 24 hours, come back with a solution within 3 days, and take responsibility when the fault is caused by our product.

Questions Buyers Ask

Questions About Quality Assurance and Testing

Which certification do you hold?

IATF 16949:2016. Production and quality control are performed strictly according to the IATF 16949:2016 documents. Product pages on our catalogue also carry ISO 9001:2015.

How many parts get the leakage test?

All of them. The leakage test is carried out on 100 percent of spare parts before delivery.

Can I see the production process before ordering?

Yes. We have recorded video of every process step and of the tests, and published them on YouTube.

Where do the components come from?

From named suppliers including Alstrom Korea, Hollingsworth and Vose USA, Gessner Germany, AB glue from Taiwan and BAO Steel Shanghai.

What happens if a batch fails in my market?

Contact us with the details. We reply within 24 hours and give you a solution within 3 days, and we take responsibility if the cause is our product.

Do you do incoming inspection on bought in components?

Component sources are fixed to the named suppliers above and controlled under the IATF 16949:2016 process documents rather than bought on price per batch.

Start With Quality Assurance and Testing

Message us with what you need and we will tell you in writing what is possible, what it costs and how long it takes before any work starts.