Lighting Project in Spain
A long space lit by repeated fixtures shows any colour temperature variation along the run.
The Project
A Spanish project lighting a long circulation and display space.
Project ChallengeWhat Made It Difficult
A long space lit by repeated fixtures shows any colour temperature variation along the run.
What The Buyer Was Worried About
- Colour temperature variation is obvious along a long run
- Fixtures at intervals must be identical
- Stepped ceilings need more than one drop length
What We Supplied
The full quantity was produced in one run at a single colour temperature, with drop lengths listed per ceiling level.
Colour temperature fixed for the whole order
Drop schedule per ceiling level
One production run
Packing by ceiling level
Getting It To Site
Delivered as one consignment, marked by ceiling level.
What We Checked
Boards built to one colour temperature for the whole order and checked before assembly.
How It Ended
The run reads as one continuous colour along its whole length.
What The Buyer Gained
No mixed colour temperature and no on-site sorting.
Related Products
Questions About This Project
Can you supply a project of this type again?
Yes. This is normal project work for us and runs through our retail and showrooms process.
What do you need to quote a project like this?
A fixture schedule with quantities, finishes and colour temperatures, plus measured ceiling heights if drops are to be cut at the factory.
How long would production take?
20 days or less on the models in this catalogue. Transit is quoted separately and depends on the shipping mode.
Is the client named?
No. We describe projects by type and destination rather than naming clients, unless the client has asked us to.
Have A Similar Project
Send the fixture schedule or a photograph of the space and we tell you which models fit and what it costs.
