Decorative LED lighting manufacturer in Zhongshan China since 2016 [email protected]+86 138 2394 0732
Large ceiling installation of pendant elements in a hotel lobby
Case Study

Chandelier Project in Dubai

A lobby ceiling of that size cannot be held by one fixture, so the installation had to be built from repeated elements that still read as one piece.

Client Background

The Project

A hospitality interior in Dubai requiring a large ceiling installation over a lobby.

Project Challenge

What Made It Difficult

A lobby ceiling of that size cannot be held by one fixture, so the installation had to be built from repeated elements that still read as one piece.

Customer Pain Points

What The Buyer Was Worried About

  • Repeated elements show any finish variation immediately
  • Large installations are vulnerable in transit
  • Installation sequence has to be planned before the crates arrive
Our Solution

What We Supplied

Repeating pendant elements produced in a single spray batch and packed in installation sequence.

  1. Element count and layout agreed

  2. Single spray batch for all elements

  3. Cartons marked in installation order

  4. Drop test on the packed carton

Supply Chain Coordination

Getting It To Site

Cartons marked so the installation team could unpack in sequence rather than opening every box.

Quality Control

What We Checked

Finish compared element to element inside the batch before packing.

Final Result

How It Ended

The installation went up as a single visual field with no visible batch variation between elements.

Customer Benefit

What The Buyer Gained

One spray batch removed the finish risk that repeated elements normally carry.

Questions Buyers Ask

Questions About This Project

Can you supply a project of this type again?

Yes. This is normal project work for us and runs through our hotels and hospitality process.

What do you need to quote a project like this?

A fixture schedule with quantities, finishes and colour temperatures, plus measured ceiling heights if drops are to be cut at the factory.

How long would production take?

20 days or less on the models in this catalogue. Transit is quoted separately and depends on the shipping mode.

Is the client named?

No. We describe projects by type and destination rather than naming clients, unless the client has asked us to.

Have A Similar Project

Send the fixture schedule or a photograph of the space and we tell you which models fit and what it costs.