


The Sinotruk HOWO 16000 litre sewage water tanker is a 6x4 vacuum suction truck built on a Sinotruk HOWO chassis for municipal sanitation and waste management operations in regions with limited sewer infrastructure. It is designed to collect sludge, mud, and debris from manholes, water wells, and sediment pits using a vacuum pump system and discharge it at treatment sites. The truck operates in urban and rural areas where gravity-fed sewer systems are absent or overloaded, and it supports public works departments that require reliable, on-demand waste removal without relying on third-party contractors.
| Chassis | Sinotruk HOWO 6x4 |
|---|---|
| Engine | WD615.69, 336 HP, diesel, turbocharged, 6-cylinder, 9726ml |
| Transmission | 10 forward, 2 reverse, manual |
| Overall Size | 9000 x 2500 x 3300 mm |
| Tank Capacity | 16000 L |
| Tank Material | Q345 carbon steel, 5mm thickness |
| Suction Depth | Up to 9 metres vertical |
| Suction Distance | Up to 80 metres horizontal |
| Pumping Speed | 45 L/s |
| Full Tank Pumping Time | ≤ 5 minutes |
| Tank Emptying Time | ≤ 4 minutes |
| Max Speed | 90 km/h |
| Gross Vehicle Weight | Appro × 25000 kg |
| Curb Weight | Appro × 10000 kg |
| Payload | Appro × 15000 kg |
| Wheelbase | 4325 + 1350 mm |
| Cabin | Flat top, sleeper, air conditioner, power steering, 3 passengers |
| Drive Form | 6x4 |
| Emission Standard | Euro 2 |
| Suction Pipe | 1 piece, 7m length |
| PTO | Equipped |
| Vacuum Pump | Equipped |
| Oil Water Separator | Equipped |
| Overflow Valve | Equipped |
| Looking Window | Equipped |
| Self-Flow Exit | Equipped |
| Hand Washing Device | Equipped |
| Lead Time | 20 days after deposit |
| Shipping Mode | Ro-ro, bulk ship, or container from China main port |
| 8x4 sewage tanker with 12000L tank | Smaller capacity but better turning radius in narrow city streets |
|---|---|
| Standard dump truck with vacuum attachment | Less reliable vacuum system and no dedicated waste handling features |
| Used imported vacuum truck | Higher long-term maintenance cost and parts availability risk |
Production time is 20 days after the advance payment is received. Delivery time depends on the shipping mode chosen.
Yes. The standard tank is Q345 carbon steel. Stainless steel 304 is available on request. Specify the waste type and storage duration for material confirmation.
T/T with 30 percent deposit and 70 percent before delivery. We send photos and videos of the finished truck before you pay the balance.
Yes. The chassis is ordered in left or right hand drive to match local traffic rules. Confirm this at order stage.
By Ro-ro, bulk ship, or container from a China main port. Trade terms can be EXW, FOB, CFR, or CIF.
The whole vehicle is guaranteed for one year and core parts for two years. We provide 15 years of spare parts and technical support.
Yes. The standard is a single Veyron pump. A double Veyron system is available for higher flow and faster pumping.






Send us your destination port and we will quote price, lead time and freight.