Shinetech Industrial Co., Ltd Request A Quote
Quality Control And Testing at the Shinetech factory

Quality Control And Testing

Every-step QC and final QC on in-house test equipment

What This Covers

We take pride in our rigorous quality control processes, which include every-step QC and final QC checks to ensure that all goods are of the highest quality before packing. The testing is done on our own equipment, on site, which is why the results come back inside the production schedule rather than after it.

Step By Step

  1. Incoming material checkComponents verified against the approved bill of materials.
  2. In-process QCChecks at every step of assembly rather than only at the end of the line.
  3. Electrical and charging testPD test station for charging behaviour and function.
  4. Environmental and safety testBall pressure temperature test chamber and horizontal and vertical flammability tester.
  5. Mechanical abuse testDrop tester, dual drum drop tester, falling ball impact tester, abrasion wear test machine.
  6. Life testButton life tester, horizontal plug and pull force tester, wire flexibility tester.
  7. Final QC before packingCosmetic, function and packing check on the finished goods.

What You Receive

  • Test evidence from the equipment listed above
  • Final QC report before packing
  • Retained approval sample as the reference standard
  • Certificate copies for the models they cover

Equipment Behind This Step

Photographed at our own facility.

Mobile phone drop tester
Mobile phone drop testerSingle-drop testing onto a hard surface, the failure mode most portable audio products meet first.
Button life tester and horizontal plug and pull force tester
Button life tester and horizontal plug and pull force testerSwitch actuation life and connector retention, two of the most common warranty failures in portable audio.
Wire flexibility tester
Wire flexibility testerCable bending at the strain relief, where cables normally fail first.
Horizontal and vertical flammability tester
Horizontal and vertical flammability testerMaterial behaviour under flame, tested on the housing materials specified for each project.
Ball pressure temperature test chamber
Ball pressure temperature test chamberChecks that plastics hold their form at elevated temperature rather than softening in service.
Falling ball impact tester
Falling ball impact testerImpact resistance of housings, lenses and display windows.

Questions About Quality Control And Testing

What test equipment do you operate?

Aging racks, battery capacity sorting cabinets, a PD test station, a horizontal and vertical flammability tester, a ball pressure temperature test chamber, a dual drum drop tester, a wire flexibility tester, a mobile phone drop tester, an abrasion wear test machine, a button life tester with horizontal plug and pull force testing, a falling ball impact tester, a silk screen abrasion resistance tester and a visual capture laser engraving station.

What certification do you already hold?

We hold a CE Certificate of Compliance issued by BCTC under the R&TTE directive 99/5/EC and a RoHS Certificate of Compliance, both covering our Bluetooth speaker models ST-871, ST-872, ST-878, ST-861, ST-862, ST-868, ST-851, ST-852, ST-858, ST-821, ST-822 and ST-828, together with a Chinese utility model patent certificate.

Will my model be certified?

Certification scope is agreed per project, because it depends on the model and the destination market. Ask for the current certificate list for the specific model you are quoting.

Can I inspect before shipment?

Yes. We warmly welcome you to visit us anytime, and third party inspection can be arranged at either site.

Talk To An Engineer About Quality Control And Testing

Send your drawings, your specification or just your brief. We answer on WhatsApp and by email, and we do not use upload forms.

WhatsAppEmail