Shinetech Industrial Co., Ltd Request A Quote
Manufacturing And Assembly at the Shinetech factory

Manufacturing And Assembly

10,000 m², 100 professionals and 200,000 headphones and speakers a month

What This Covers

Production runs across our Guangdong and West China bases. The published capacity is a monthly output of 200,000 headphones and speakers from 10,000 square metres of floor space with 100 professionals, supported by a strong technical department, an experienced molding team and a responsible production department.

Step By Step

  1. Material preparationComponents staged against the approved bill of materials.
  2. SMT and board level assemblyBoards prepared and verified before they reach the line.
  3. Battery capacity sortingCells sorted on our battery capacity sorting cabinets so runtime is consistent across a batch.
  4. AgingAssemblies run on aging racks to surface early-life failures before they ship.
  5. PD and function testCharging and function testing at the dedicated PD test station.
  6. Final assembly and packingEvery-step QC through assembly, then final QC before packing.

What You Receive

  • Production schedule against your delivery date
  • In-line QC records for the batch
  • Final QC sign-off before packing
  • Packing list and carton specification
  • Global logistics arranged as part of the one-stop service

Equipment Behind This Step

Photographed at our own facility.

Assembly line, Guangdong
Assembly line, GuangdongProduct assembly on one of the main lines. Our published capacity is 200,000 headphones and speakers per month across 10,000 square metres.
Line-side staging and packing
Line-side staging and packingFinished goods staged for final QC and packing. Final QC checks are completed before anything is packed.
Aging racks
Aging racksAssembled units run on aging equipment so early-life failures are found in the factory rather than by the customer.

Questions About Manufacturing And Assembly

What is the monthly capacity?

200,000 headphones and speakers per month, from 10,000 square metres with 100 professionals.

Where is production located?

Our primary manufacturing bases are in Guangdong, China and West China. The Shenzhen office is in Bao'an and the Dongguan site is in Hengli.

How is battery runtime kept consistent?

Cells are sorted on battery capacity sorting cabinets before assembly, so a batch does not mix high and low capacity cells.

What is the lead time?

Around 1 to 3 weeks depending on order quantity.

Talk To An Engineer About Manufacturing And Assembly

Send your drawings, your specification or just your brief. We answer on WhatsApp and by email, and we do not use upload forms.

WhatsAppEmail