Shenzhen source factory since 2009 · OEM and ODM welcome
Rapid Sampling And Tooling at the LinkitPower factory
Solution

Samples Within 72 Hours So You Do Not Miss The Window

Most sampling delay is not manufacturing time, it is queue time and translation loss between a sales office and a workshop. We removed both. Engineering teams talk directly to the floor, and standard-model samples leave within 72 hours.

Process

How This Actually Runs

  1. Requirement Call

    One conversation on WhatsApp or email fixes the model, the branding and the target market.

  2. Engineering Check

    Structural engineers confirm the change is producible before anything is cut, so the sample is representative of mass production.

  3. Sample Build

    Samples within 72 hours for standard models, with branding steps quoted separately and dated up front.

  4. Sample Review

    You test in your own market conditions. Adjustments loop straight back to the same engineers.

  5. Production Release

    The approved sample becomes the inspection reference for IQC, IPQC and FQC on the production run.

FAQ

Questions About Rapid Sampling And Tooling

Is the 72 hours from payment or from order

From sample confirmation, which is when model, branding and quantity are all agreed. We give you a firm date at that point.

Are samples free

Sample and freight cost depends on the model and the customisation involved. Ask on WhatsApp with the model number and we will quote it directly.

Does the sample match mass production

Yes, that is the point of building it on the same line. The approved sample is kept as the inspection reference for the production run.

Can you sample a modified version

Yes. Modifications to size, material or function are assessed first, then sampled. Custom work takes longer than the 72-hour standard turnaround and we date it in advance.

Start With A Conversation

Send your drawing, your sample photo or just your requirement. Our engineers give manufacturability feedback free of charge.