How This Actually Runs
Requirement Call
One conversation on WhatsApp or email fixes the model, the branding and the target market.
Engineering Check
Structural engineers confirm the change is producible before anything is cut, so the sample is representative of mass production.
Sample Build
Samples within 72 hours for standard models, with branding steps quoted separately and dated up front.
Sample Review
You test in your own market conditions. Adjustments loop straight back to the same engineers.
Production Release
The approved sample becomes the inspection reference for IQC, IPQC and FQC on the production run.
Products This Service Is Used On Most
2 In 1 Adapter B22P Dual Plug
USB-A and Type-C on the same body, dual band 5.8 GHz plus 2.4 GHz, Bluetooth 5.4.
View SpecificationsAI Box T11
Four cores in a metal body, 64 g, with 4K image quality and HDMI video output.
View SpecificationsLow Wattage Folding Solar Panel
Pocket-format mono cell panels for phones, tablets and power banks.
View SpecificationsQuestions About Rapid Sampling And Tooling
Is the 72 hours from payment or from order
From sample confirmation, which is when model, branding and quantity are all agreed. We give you a firm date at that point.
Are samples free
Sample and freight cost depends on the model and the customisation involved. Ask on WhatsApp with the model number and we will quote it directly.
Does the sample match mass production
Yes, that is the point of building it on the same line. The approved sample is kept as the inspection reference for the production run.
Can you sample a modified version
Yes. Modifications to size, material or function are assessed first, then sampled. Custom work takes longer than the 72-hour standard turnaround and we date it in advance.
Start With A Conversation
Send your drawing, your sample photo or just your requirement. Our engineers give manufacturability feedback free of charge.
