How This Actually Runs
IQC On Incoming Material
Raw material and component batches are inspected on arrival, before anything reaches the line.
IPQC On The Line
In-process checks catch assembly drift while the batch is still open and correctable.
FQC Before Packing
Final inspection is the last gate. Non-conforming products never leave the warehouse.
Certification
CE, RoHS, FCC and IP-rated test reports across the range, with the certificate files available to download.
After Sales
Twelve-month warranty against manufacturing defects, free replacement parts or repair, and a technical response within 48 hours.
Products This Service Is Used On Most
AI Box Q2S
77 g, eight cores, and a choice between 4G plus 64G and 8G plus 128G at order time.
View SpecificationsETFE Folding Solar Panel
Higher conversion efficiency, lighter, more waterproof and more durable than the sewn format.
View SpecificationsGK03 Sodium Battery Jump Starter 27500mAh
The high-capacity sodium starter: 27500mAh with PD 60W, for fleets that start more than one vehicle a day.
View SpecificationsRelated Categories
Questions About Quality Control And Certification
Can we audit the factory
Yes. Factory audits are welcome at any time, and real-time production tracking is available while your order runs.
Which certificates can we download now
CE and RoHS examination certificates, the FCC supplier declaration of conformity and the IP waterproof test report are all in the Download Center as PDF files.
What does the 12-month warranty cover
Manufacturing defects. We provide free replacement parts or a repair solution, handled by the factory rather than an intermediary.
How quickly do you answer a quality problem
A proposed solution comes back within 48 hours, with technical support available while you implement it.
Start With A Conversation
Send your drawing, your sample photo or just your requirement. Our engineers give manufacturability feedback free of charge.
